Skip to main content
TRIS logo image
Search275,000+ actors, artists, objects, artworks, films, exhibitions, archives

EN

EN

English

HI

Hindi

EN

EN

English

HI

Hindi

Tuli Research Centre for India Studies

Tuli Research Centre for India Studies

Vision

Manifesto

Archive & Library

Vanraja Sanctuary & Hospice

Home

Research Categories

Browse All

ICore

1_CinemaEducation_Cinema as a Critical Educational Resource

2_FineArts_Modern and Contemporary Indian Fine Arts

3_Photography_Photography in India

4_PopCulture_The Printed Image, Popular Arts, and Crafts

IIMaterial

5_ArcHeritage_India's Architectural Heritage as Inspiration

6_EconomicsArt_Economics of Art & Cultural Industry

7_Travel_Automobile, Transport and Travel Heritage

8_Uncertainty_Uncertainty

IIICritical

9_SocialDuty_Social Responsibility of the Creative Mind

10_Childhood_The Changing Smile of Childhood & Its Second Coming

11_Sensuality_The Sensual Discipline within Creativity

12_Scholarship_The History & Historiography of Scholarship in the Arts, Humanities, and Social Sciences

IVMeaningful

13_SeekJustice_Seeking Justice and Political Integrity

14_IndoWorld_India and her Relationship with the World

15_SpiritualPoetics_The Religious-Spiritual-Poetic-Philosophical Framework

16_Continuum_The Animal-Human-Nature Continuum

Explore

All

Posts

Masterlists

Calendar

Live | Upcoming

All Events

Timetable

Search275,000+ actors, artists, objects, artworks, films, exhibitions, archives

EN

EN

English

HI

Hindi

Jehangir Sabavala

Jehangir Sabavala

Virgob. 23 Aug 1922, Bombay, Maharashtra, Indiad. 02 Sep 2011, Bombay, Maharashtra, India

Personality.Artist
On this Page
Introduction
Exhibitions194
Integrated Timeline74
Chronicled Highlights26
Economics of Art228
Research Centre1,172
All1,172
Library806Archive366Highlights15
Home/2_FineArts/Personality · Artist/Jehangir Sabavala
Jehangir Sabavala — featured artwork

Introduction

Born in an affluent Parsi family whose history was intertwined with the history of Bombay, Jehangir Sabavala was among the first generation of post-colonial artists in India. Sabavala strayed away from any group affiliations that were prominent during his time and developed his pictorial language that was inspired and shaped by his art school training, his international travels and the cubist pedagogy imparted by his mentor Andre Lhote. His closeness to nature results in vivid and serene landscapes that are often desolate and sometimes populated by the figures of magicians, sorcerers and ascetics.
Date of Birth
23 Aug 1922
Zodiac sign
Virgo
Date of Death
02 Sep 2011
Age
89
Place of Birth
Bombay, Maharashtra, India
Place of Death
Bombay, Maharashtra, India
Spouse(s)
Shirin Sabavala1924 – 2017
Year Marriage Registered
1948
Children
Aafreed Sabavalab. 1959
Parent(s)
Ardeshir Pestonjee Sabavala1890 – 1955
Meherbai Sabavala1891 – 1970
Grandparent(s)
Sir Jehangir Cowasjee Jehangir16 Feb 1879 – 17 Oct 1962
Ancestor(s)
Hirji Jivanji
Sir Cowasjee Jehangir Readymoney24 May 1812 – 19 Jul 1878
Siblings
Sharokh Sabavala
State Country of Birth
Maharashtra, India
State Country of Death
Maharashtra, India
  1. 1939

    1. Elphinstone College, University of Mumbai, India

      1939 – 1941

  2. 1942

    1. Sir J.J. School of Art, Mumbai, India

      1942 – 1944

  3. 1945

    1. Heatherley School of Art, London, UK

      1945 – 1947

  4. 1948

    1. Academie Andre Lhote, Paris, France

      1948 – 1951

  5. 1953

    1. Attended the Academie Julian, Paris, France

      1953 – 1954

  6. 1957

    1. Attended the Academie de la Grande Chaumiere, Paris, France

Exhibitions

  1. 1949

    1. Exposition du ler Grand Prix de Peinture, Monaco
  2. 1950

    1. Salon National Independent, Paris, France
  3. 1951

    1. 02 Apr 1951 to 11 Apr 1951

  4. 1952

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
  5. 1953

    1. 28 Feb 1953 to 09 Mar 1953

    2. Annual Exhibition, Bombay Art Society, Mumbai, India
  6. 1954

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
    2. Exhibited at the 'Venice Biennale', Italy
  7. 1955

    1. 3rd One-Man Show, Jehangir Art Gallery, Mumbai, India

      15 Oct 1955 to 23 Oct 1955

    2. Annual Exhibition, Bombay Art Society, Mumbai, India
    3. Annual Exhibition, Lalit Kala Akademi, New Delhi, India
  8. 1956

    1. One Man Show at the All India Fine Arts & Crafts Society (AIFACS), New Delhi, India

      03 Jan 1956 to 11 Jan 1956

    2. Annual Exhibition, Lalit Kala Akademi, New Delhi, India
  9. 1957

    1. Annual Exhibition, Lalit Kala Akademi, New Delhi, India
  10. 1958

    1. 15 Oct 1958 to 23 Nov 1958

  11. 1960

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
    2. Annual Exhibition, Calcutta Art Society, Kolkata, India
  12. 1961

    1. Exhibition of Paintings - Jehangir Sabavala, Jehangir Art Gallery, Mumbai, India

      27 Oct 1961 to 02 Nov 1961

    2. Annual Exhibition, Calcutta Art Society, Kolkata, India
  13. 1962

    1. 07 Jan 1962 to 14 Jan 1962

    2. Annual Exhibition, Calcutta Art Society, Kolkata, India
  14. 1963

    1. 21 Feb 1963 to 04 Mar 1963

    2. Annual Exhibition, Bombay Art Society, Mumbai, India
    3. Annual Exhibition, Calcutta Art Society, Kolkata, India
  15. 1964

    1. 29 Jan 1964 to 07 Feb 1964

    2. Annual Exhibition, Bombay Art Society, Mumbai, India
    3. Contemporary Indian Art, Exhibition at Farmer's Blaxland Gallery, Sydney, Australia
    4. The New Man, Exhibition held for the 38th International Eucharistic Congress, Mumbai, India
  16. 1965

    1. The Laing Art gallery, Newcastle-on-Tyne, UK
    2. Annual Exhibition, Bombay Art Society, Mumbai, India
    3. Contemporary Indian Painter's, Taj Art Gallery & Gallery Chemould, Mumbai, India
    4. The Commonwealth Arts Festival, London, UK
  17. 1966

    1. Kunika-Chemould Art Centre, New Delhi, India

      12 Dec 1966 to 21 Dec 1966

    2. 17 Nov 1966 to 26 Nov 1966

    3. Art Now in India, Ghent, Belgium
    4. Exhibited at 'The First Bombay Arts Festival, Mumbai, India
  18. 1968

    1. Art Scene To-day, Ahmedabad, India
  19. 1969

    1. 19 Jun 1969 to 28 Jun 1969

    2. Commonwealth Institute Art Gallery, Edinburgh, Scotland, UK

      10 Oct 1969 to 23 Oct 1969

    3. 29 Aug 1969 to 21 Sep 1969

  20. 1970

    1. Indian Painters, Teheran, Iran
  21. 1972

    1. 12 Dec 1972 to 22 Dec 1972

    2. 25 Years of lndian Art, New Delhi, India
  22. 1973

    1. 23 Feb 1973 to 03 Mar 1973

    2. Jehangir Art Gallery, Mumbai, India

      16 Feb 1973 to 22 Feb 1973

    3. National Exhibition of Art, Lalit Kala Akademi, New Delhi, India
    4. 25 Years of lndian Art, Mumbai, India
    5. 25 Years of lndian Art, Chennai, India
  23. 1974

    1. A Handbook of Painting and Graphics, National Gallery of Modern Art, New Delhi, India
    2. A Handbook of Painting and Graphics, National Gallery of Modern Art, New Delhi, India
  24. 1975

    1. Contemporary Art from India, Washington DC, USA
    2. The Contemporary Indian Artists from Maharashtra, New Delhi, India
    3. Gallery Nasrudin, Boston, USA
  25. 1976

    1. Jehangir Art Gallery, Mumbai, India

      19 Mar 1976 to 25 Mar 1976

    2. Exhibition, Shridharani Gallery, Triveni Kala Sangam, New Delhi, India

      16 Apr 1976 to 23 Apr 1976

    3. Exhibition, Jehangir Art Gallery, Auditorium, Bombay, India

      19 Mar 1976 to 25 Mar 1976

    4. 18th Annual State Art Exhibition, Maharashtra, Mumbai, India
    5. Art Exhibition, the 25th Pugwash Conference, Chennai, India
  26. 1979

    1. Jehangir Sabavala, Art Heritage, Triveni Kala Sangam, New Delhi, India

      16 Nov 1979 to 30 Nov 1979

    2. Asian Artists' Exhibition, Fukuoka Art Museum, Japan
    3. Kala Yatra's Exhibition of Contemporary Indian Painting and Sculpture, Kuala Lumpur, Malaysia
  27. 1980

    1. 08 Jan 1980 to 14 Jan 1980

    2. Kala Yatra's Exhibition of Contemporary Indian Painting and Sculpture, Kolkata, India
    3. National Exhibition of Art, Lalit Kala Akademi, New Delhi, India
  28. 1981

    1. Kala Yatra's Exhibition of Contemporary Indian Painting and Sculpture,Kochi, India
    2. Indian Painting Today, Jehangir Art Gallery, Mumbai, India
  29. 1982

    1. Modern Indian Paintings, Smithsonian Institution, Washington, USA
  30. 1983

    1. One Man Exhibition, Kolkata, India
    2. 14 Nov 1983 to 21 Nov 1983

  31. 1985

  32. 1988

    1. 14 Jan 1988 to 27 Jan 1988

    2. Art for CRY, Mumbai, Kolkata, New Delhi & Bengaluru, India
    3. 05 Apr 1988 to 13 Apr 1988

    4. The Gallery, Chennai, India

      19 Feb 1988 to 29 Feb 1988

  33. 1990

    1. Indian Painting Today, Jehangir Art Gallery, Mumbai, India
    2. Tradition and Change, Bal Gandharva Art Gallery, Pune, India
    3. Art Mosaic, Kolkata, Mumbai & New Delhi, India
    4. Annual Exhibition, Birla Academy of Art & Culture, Kolkata, India
  34. 1991

    1. Seventh Triennale India, New Delhi, India
  35. 1992

    1. Pioneers to the New Generation, Arts Acre, Kolkata, India
    2. Artists Against Communalism, Mumbai, India
    3. Masters of India Art Show, Art Trust, Mumbai, India
    4. Birla Academy of Art and Culture, Kolkata, India
  36. 1993

    1. Exhibition of Paintings by Jehangir Sabavala, Jehangir Art Gallery, Mumbai, India

      17 Feb 1993 to 24 Feb 1993

    2. 11 Mar 1993 to 17 Mar 1993

    3. Bombay Art Society, Mumbai, India
    4. Kolkata Art Society, Kolkata, India
    5. Karnataka Lalitha kala Academy
    6. Lalit Kala Akademi, New Delhi, India
  37. 1994

    1. Art Mosaic, Kolkata, Mumbai & New Delhi, India
    2. Review 1990-93', National Gallery of Modern Art, New Delhi, India
    3. People for Animals, Jehangir Art Gallery, Mumbai & Taj Palace Hotel, New Delhi, India
  38. 1995

    1. Indian Contemporary Art, Gallery Petronas, Kuala Lumpur, Malaysia
    2. People for Animals, Jehangir Art Gallery, Mumbai & Taj Palace Hotel, New Delhi, India
    3. Artists Against Communalism, Mumbai, India
    4. Art for CRY, Mumbai, Kolkata, New Delhi & Bengaluru, India
  39. 1996

    1. Annual Exhibition, Birla Academy of Art & Culture, Kolkata, India
    2. Harmony Show, Nehru Centre, Mumbai, India
    3. Urban Signals Shifting Images, Birla Academy of Arts & Culture, Kolkata & Mumbai, India
    4. 29 Oct 1996 to 15 Nov 1996

  40. 1997

    1. The Searching Spirit, Singapore
    2. Fifty Years of Art in Mumbai : 1941-91, National Gallery of Modern Art, Mumbai, India (Cu. Dr. Saryu Doshi)
    3. Image Beyond Image - The Masanori Fukuoka Collection, National Gallery of Modern Art, Mumbai, India
    4. Fifty Years of Freedom of Expression, organized by R.P.G., Jehangir Art Gallery, Mumbai, India
    5. Colours of Independence, National Gallery of Modern Art, New Delhi, India
    6. The Looking Glass Self, Lakeeren, Mumbai, India
    7. Rare and Important Paintings, The Classic Source & Sakshi Gallery, Mumbai, India
    8. The Search, Apparao Galleries, Chennai & New York, U.S.A.
    9. HEART : Intuitive Logic - II, Mumbai, India
  41. 1998

    1. 25 Mar 1998 to 31 Mar 1998

    2. Spirit and Soul : Indian Pantings Today, Hong Kong Land, Hong Kong
    3. Ruminations, Apparao Galleries, Mumbai, India
    4. A Collector's Eye, Jehangir Nicholson Collection, Jehangir Art Gallery, Mumbai, India
    5. Indian Contemporary Art, Leverkusen and Monheim, Germany (Presented by: RPG and Bayer)
    6. World wide fund for Nature, New Delhi, India
  42. 1999

    1. Flashback - Flashforward, Jehangir Art Gallery,Mumbai, India (Organised by: RPG Enterprices)
    2. The World is Round & Time is Cyclical, Art Today, New Delhi, India
    3. Art with a Heart, Rotary Club of Mumbai, Mumbai, India
    4. Prabhakar Barwe, S.H. Raza & J.A. Sabavala - Experiments in Stillness, The Window, Mumbai, India
    5. The Indian Fine Arts Society, Singapore
  43. 2000

    1. Harmony Show, Nehru Centre, Mumbai, India
    2. A Sorrowful Mystery, The Arts Trust (Chennai), National Gallery of Modern Art, Mumbai, India
    3. Distillations, Birla Academy of Art and Culture, Mumbai, India
    4. The Millennium Show, Nehru Centre, Mumbai, India
    5. RPG Collection, National Gallery of Modern Art (NGMA), Mumbai, India
  44. 2001

    1. Ideas and Images - Part III, National Gallery of Modern Art (NGMA), Mumbai, India
    2. Engendering Images of a Woman, Presented by The Guild Art Gallery, Mumbai, India
  45. 2002

    1. 23 Jan 2002 to 04 Feb 2002

    2. Occasions of Light: Recent Paintings by Jehangir Sabavala, Shridharni Gallery, New Delhi, India (organized by Sakshi Gallery)

      27 Feb 2002 to 29 Mar 2002

    3. Occasions of Light: Recent Paintings by Jehangir Sabavala, Gallery ArtsIndia, New York, USA (organized by Sakshi Gallery)

      18 Apr 2002 to 09 May 2002

    4. India: Contemporary Art from the Northeastern Private Collection, New Jersey, USA
  46. 2003

    1. Recent Pantings, All India Fine Arts & Crafts Society (AIFACS), New Delhi, India (Organised by: Gallery Arts Trust, Chennai)

      11 Mar 2003 to 17 Mar 2003

    2. Ideas and Images - Part III, National Gallery of Modern Art (NGMA), Mumbai, India
    3. Rain, Galerie International & Sakshi Art Gallery, Mumbai, India
  47. 2004

    1. The Jehangir Nicholson Collection, Mumbai, India
    2. The Search, Mumbai, India
    3. Ideas and Images - Part III, National Gallery of Modern Art (NGMA), Mumbai, India
  48. 2005

    1. 19 Dec 2005 to 09 Jan 2006

    2. Trends and Techniques: Water Colour in India, Galerie 88, Kolkata, India
  49. 2007

    1. 06 Apr 2007 to 15 Apr 2007

    2. Inaugural Show new space, colaba, Sakshi Gallery, Mumbai, India
  50. 2008

    1. 27 Sep 2008 to 13 Oct 2008

  51. 2009

    1. Bharat Ratna! Jewels of Modern Indian Art, Museum of Fine Arts, Boston, U.S.A.
    2. Master Class, The Arts Trust, Mumbai, India
    3. A Collection Of Small Works, Sakshi Gallery, Mumbai, India
    4. Gallery collection, Sakshi Gallery, Mumbai, India

      13 Jul 2009 to 29 Jul 2009

  52. 2010

    1. The Modernists, RL Fine Arts, New York, U.S.A.
    2. Evolve: 10th Anniversary Show, Tao Art Gallery, Mumbai, India
    3. Roots, Sakshi Gallery, Mumbai, India

      21 Jan 2010 to 23 Jan 2010

    4. Gallery Collection, Sakshi Gallery, Mumbai, India

      23 Feb 2010 to 12 Mar 2010

    5. Third Dimension, Sakshi Gallery, Mumbai, India

      07 Jun 2010 to 09 Jul 2010

    6. Roots, 25th Anniversary Exhibition of Sakshi Art Gallery, Mumbai at The Park, Chennai, India

      16 Sep 2010 to 18 Sep 2010

    7. Figure/Landscape: Part One, Aicon Gallery, New York, U.S.A.

      28 Oct 2010 to 20 Nov 2010

    8. On View, Sakshi Gallery, Mumbai, India

      25 Nov 2010 to 11 Dec 2010

    9. Figure/Landscape: Part Two, Aicon Gallery, London, U.K.

      03 Dec 2010 to 09 Jan 2011

  53. 2011

    1. Remembering Jehangir Sabavala, Sakshi Gallery, Mumbai, India

      01 Sep 2011 to 09 Sep 2011

    2. Form and Formlessness, Art Alive Gallery, Gurgaon, India
    3. Roots in the Air, Branches Below: Modern & Contemporary Art from India, San Jose Museum of Art, San Jose, U.S.A.
    4. Masters Ltd: Limited Editions, Gallery Beyond, Mumbai, India
    5. Ethos V: Indian Art Through the Lens of History (1900 to 1980), Indigo Blue Art, Singapore
    6. India Art Summit, Sakshi Gallery, Mumbai, India

      19 Jan 2011 to 22 Jan 2011

    7. High-Light, at The Oberoi, Mumbai, India (Presented by: Sakshi Gallery)

      06 May 2011

    8. Anecdotes, Sakshi Gallery, Mumbai, India

      04 Jul 2011 to 29 Jul 2011

    9. Remembering Jehangir Sabavala, Sakshi Gallery, Mumbai, India

      01 Sep 2010 to 09 Sep 2011

  54. 2012

    1. Sightings, Sakshi Gallery, Mumbai, India

      11 Jan 2012 to 10 Feb 2012

    2. Contemporary: A Selection of Modern and Contemporary Art, at The Park, Chennai, India (Prsented by: Sakshi Gallery)

      08 Mar 2012 to 10 Mar 2012

    3. Through the Ages: South Asian Sculpture and Painting from Antiquity to Modernism, Aicon Gallery, New York, U.S.A.

      16 Mar 2012 to 12 May 2012

    4. Iconic Processions, Aicon Gallery, New York, U.S.A.

      11 Sep 2011 to 20 Oct 2012

    5. Manifestations VIII-20th century Indian Art, Delhi Art Gallery, New Delhi, India

      22 Nov 2012 to 29 Dec 2012

    6. Diva, Sakshi Gallery, Mumbai, India

      30 Nov 2012 to 14 Jan 2013

  55. 2014

    1. Immutable Gaze Part I: Masterpieces of Modern and Pre-Modern Indian Art, aicon Gallery, New York, U.S.A.

      14 Mar 2014 to 12 Apr 2014

    2. Shifting the Paradigm, Aicon Gallery, Greenwich Village, New York, U.S.A.

      12 Sep 2014 to 18 Oct 2014

  56. 2015

    1. INDIA MODERN, Narratives from 20th Century Indian Art, DAG, New York, U.S.A.

      18 Mar 2015 to 06 Jun 2015

    2. Art Exchange, Sakshi Gallery, Mumbai, India

      01 Jul 2015 to 06 Aug 2015

    3. INDIA MODERN, Narratives from 20th Century Indian Art, DAG, New Delhi, India

      13 Jul 2024 to 12 Sep 2015

    4. INDIA MODERN, Narratives from 20th Century Indian Art, DAG

      25 Sep 2015 to 05 Dec 2015

  57. 2017

    1. Masterpieces of Indian Modern Art. Edition II, Delhi Art Gallery, New Delhi, India

      01 Mar 2017 to 30 Jun 2017

    2. Easy Buy @ Sakshi Salon, Colaba, Sakshi Gallery, Mumbai, India

      11 May 2017 to 31 May 2017

  58. 2018

    1. India's French Connection,Indian Artists in France Delhi Art Gallery, New Delhi, India
    2. NEW CONFIGURATIONS vignettes from the collection in recent years, Kiran Nadar Museum of Art, Noida, India

      27 Apr 2018 to 20 Dec 2018

    3. AD Design Show, Delhi Art Gallery Mumbai, India

      26 Oct 2018 to 28 Oct 2018

    4. India's French Connection,Indian Artists in France Delhi Art Gallery, New York, U.S.A.

      14 Nov 2018 to 08 Mar 2019

  59. 2019

    1. The Print Chamber, Kalakriti Art Gallery, Hyderabad, India

      14 Sep 2019 to 26 Sep 2019

  60. 2020

    1. Jehangir Sabavala: Pilgrim Souls, Soaring Skies, Crystalline Seas, Akara Art, Mumbai, India

      29 Oct 2020 to 10 Dec 2020

  61. 2023

    1. Remembering: 60 Years of Gallery Chemould, Chemould Prescott Road, Mumbai, India

      31 Oct 2023 to 05 Nov 2023

  62. 2024

    1. Iconic, Masterpieces of Indian Modern Art Edition 04, DAG, New Delhi, India

      21 Dec 2024 to 30 Jan 2025

Sabavala, Jehangir (Artist). Jehangir Sabavala, 1951 | Solo Exhibition Catalogue | 00882686
1 / 31

Sabavala, Jehangir (Artist). Jehangir Sabavala, 1951 | Solo Exhibition Catalogue | 00882686

  1. 1951

    1. 02 Apr 1951 to 11 Apr 1951

  2. 1953

    1. 28 Feb 1953 to 09 Mar 1953

  3. 1955

    1. 3rd One-Man Show, Jehangir Art Gallery, Mumbai, India

      15 Oct 1955 to 23 Oct 1955

  4. 1956

    1. One Man Show at the All India Fine Arts & Crafts Society (AIFACS), New Delhi, India

      03 Jan 1956 to 11 Jan 1956

  5. 1958

    1. 15 Oct 1958 to 23 Nov 1958

  6. 1961

    1. Exhibition of Paintings - Jehangir Sabavala, Jehangir Art Gallery, Mumbai, India

      27 Oct 1961 to 02 Nov 1961

  7. 1962

    1. 07 Jan 1962 to 14 Jan 1962

  8. 1963

    1. 21 Feb 1963 to 04 Mar 1963

  9. 1964

    1. 29 Jan 1964 to 07 Feb 1964

  10. 1966

    1. Kunika-Chemould Art Centre, New Delhi, India

      12 Dec 1966 to 21 Dec 1966

    2. 17 Nov 1966 to 26 Nov 1966

  11. 1969

    1. 19 Jun 1969 to 28 Jun 1969

    2. Commonwealth Institute Art Gallery, Edinburgh, Scotland, UK

      10 Oct 1969 to 23 Oct 1969

    3. 29 Aug 1969 to 21 Sep 1969

  12. 1972

    1. 12 Dec 1972 to 22 Dec 1972

  13. 1973

    1. 23 Feb 1973 to 03 Mar 1973

    2. Jehangir Art Gallery, Mumbai, India

      16 Feb 1973 to 22 Feb 1973

  14. 1976

    1. Jehangir Art Gallery, Mumbai, India

      19 Mar 1976 to 25 Mar 1976

    2. Exhibition, Shridharani Gallery, Triveni Kala Sangam, New Delhi, India

      16 Apr 1976 to 23 Apr 1976

    3. Exhibition, Jehangir Art Gallery, Auditorium, Bombay, India

      19 Mar 1976 to 25 Mar 1976

  15. 1979

    1. Jehangir Sabavala, Art Heritage, Triveni Kala Sangam, New Delhi, India

      16 Nov 1979 to 30 Nov 1979

  16. 1980

    1. 08 Jan 1980 to 14 Jan 1980

  17. 1983

    1. One Man Exhibition, Kolkata, India
    2. 14 Nov 1983 to 21 Nov 1983

  18. 1988

    1. 14 Jan 1988 to 27 Jan 1988

    2. 05 Apr 1988 to 13 Apr 1988

    3. The Gallery, Chennai, India

      19 Feb 1988 to 29 Feb 1988

  19. 1993

    1. Exhibition of Paintings by Jehangir Sabavala, Jehangir Art Gallery, Mumbai, India

      17 Feb 1993 to 24 Feb 1993

    2. 11 Mar 1993 to 17 Mar 1993

  20. 1998

    1. 25 Mar 1998 to 31 Mar 1998

  21. 2002

    1. 23 Jan 2002 to 04 Feb 2002

    2. Occasions of Light: Recent Paintings by Jehangir Sabavala, Shridharni Gallery, New Delhi, India (organized by Sakshi Gallery)

      27 Feb 2002 to 29 Mar 2002

    3. Occasions of Light: Recent Paintings by Jehangir Sabavala, Gallery ArtsIndia, New York, USA (organized by Sakshi Gallery)

      18 Apr 2002 to 09 May 2002

  22. 2003

    1. Recent Pantings, All India Fine Arts & Crafts Society (AIFACS), New Delhi, India (Organised by: Gallery Arts Trust, Chennai)

      11 Mar 2003 to 17 Mar 2003

  23. 2005

    1. 19 Dec 2005 to 09 Jan 2006

  24. 2007

    1. 06 Apr 2007 to 15 Apr 2007

  25. 2008

    1. 27 Sep 2008 to 13 Oct 2008

  26. 2009

  27. 2011

    1. Remembering Jehangir Sabavala, Sakshi Gallery, Mumbai, India

      01 Sep 2011 to 09 Sep 2011

  28. 2020

    1. Jehangir Sabavala: Pilgrim Souls, Soaring Skies, Crystalline Seas, Akara Art, Mumbai, India

      29 Oct 2020 to 10 Dec 2020

Sabavala, Jehangir (Artist). Jehangir Sabavala, 1951 | Solo Exhibition Catalogue | 00882686
1 / 28

Sabavala, Jehangir (Artist). Jehangir Sabavala, 1951 | Solo Exhibition Catalogue | 00882686

  1. 1949

    1. Exposition du ler Grand Prix de Peinture, Monaco
  2. 1950

    1. Salon National Independent, Paris, France
  3. 1952

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
  4. 1953

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
  5. 1954

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
    2. Exhibited at the 'Venice Biennale', Italy
  6. 1955

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
    2. Annual Exhibition, Lalit Kala Akademi, New Delhi, India
  7. 1956

    1. Annual Exhibition, Lalit Kala Akademi, New Delhi, India
  8. 1957

    1. Annual Exhibition, Lalit Kala Akademi, New Delhi, India
  9. 1960

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
    2. Annual Exhibition, Calcutta Art Society, Kolkata, India
  10. 1961

    1. Annual Exhibition, Calcutta Art Society, Kolkata, India
  11. 1962

    1. Annual Exhibition, Calcutta Art Society, Kolkata, India
  12. 1963

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
    2. Annual Exhibition, Calcutta Art Society, Kolkata, India
  13. 1964

    1. Annual Exhibition, Bombay Art Society, Mumbai, India
    2. Contemporary Indian Art, Exhibition at Farmer's Blaxland Gallery, Sydney, Australia
    3. The New Man, Exhibition held for the 38th International Eucharistic Congress, Mumbai, India
  14. 1965

    1. The Laing Art gallery, Newcastle-on-Tyne, UK
    2. Annual Exhibition, Bombay Art Society, Mumbai, India
    3. Contemporary Indian Painter's, Taj Art Gallery & Gallery Chemould, Mumbai, India
    4. The Commonwealth Arts Festival, London, UK
  15. 1966

    1. Art Now in India, Ghent, Belgium
    2. Exhibited at 'The First Bombay Arts Festival, Mumbai, India
  16. 1968

    1. Art Scene To-day, Ahmedabad, India
  17. 1970

    1. Indian Painters, Teheran, Iran
  18. 1972

    1. 25 Years of lndian Art, New Delhi, India
  19. 1973

    1. National Exhibition of Art, Lalit Kala Akademi, New Delhi, India
    2. 25 Years of lndian Art, Mumbai, India
    3. 25 Years of lndian Art, Chennai, India
  20. 1974

    1. A Handbook of Painting and Graphics, National Gallery of Modern Art, New Delhi, India
    2. A Handbook of Painting and Graphics, National Gallery of Modern Art, New Delhi, India
  21. 1975

    1. Contemporary Art from India, Washington DC, USA
    2. The Contemporary Indian Artists from Maharashtra, New Delhi, India
    3. Gallery Nasrudin, Boston, USA
  22. 1976

    1. 18th Annual State Art Exhibition, Maharashtra, Mumbai, India
    2. Art Exhibition, the 25th Pugwash Conference, Chennai, India
  23. 1979

    1. Asian Artists' Exhibition, Fukuoka Art Museum, Japan
    2. Kala Yatra's Exhibition of Contemporary Indian Painting and Sculpture, Kuala Lumpur, Malaysia
  24. 1980

    1. Kala Yatra's Exhibition of Contemporary Indian Painting and Sculpture, Kolkata, India
    2. National Exhibition of Art, Lalit Kala Akademi, New Delhi, India
  25. 1981

    1. Kala Yatra's Exhibition of Contemporary Indian Painting and Sculpture,Kochi, India
    2. Indian Painting Today, Jehangir Art Gallery, Mumbai, India
  26. 1982

    1. Modern Indian Paintings, Smithsonian Institution, Washington, USA
  27. 1985

  28. 1988

    1. Art for CRY, Mumbai, Kolkata, New Delhi & Bengaluru, India
  29. 1990

    1. Indian Painting Today, Jehangir Art Gallery, Mumbai, India
    2. Tradition and Change, Bal Gandharva Art Gallery, Pune, India
    3. Art Mosaic, Kolkata, Mumbai & New Delhi, India
    4. Annual Exhibition, Birla Academy of Art & Culture, Kolkata, India
  30. 1991

    1. Seventh Triennale India, New Delhi, India
  31. 1992

    1. Pioneers to the New Generation, Arts Acre, Kolkata, India
    2. Artists Against Communalism, Mumbai, India
    3. Masters of India Art Show, Art Trust, Mumbai, India
    4. Birla Academy of Art and Culture, Kolkata, India
  32. 1993

    1. Bombay Art Society, Mumbai, India
    2. Kolkata Art Society, Kolkata, India
    3. Karnataka Lalitha kala Academy
    4. Lalit Kala Akademi, New Delhi, India
  33. 1994

    1. Art Mosaic, Kolkata, Mumbai & New Delhi, India
    2. Review 1990-93', National Gallery of Modern Art, New Delhi, India
    3. People for Animals, Jehangir Art Gallery, Mumbai & Taj Palace Hotel, New Delhi, India
  34. 1995

    1. Indian Contemporary Art, Gallery Petronas, Kuala Lumpur, Malaysia
    2. People for Animals, Jehangir Art Gallery, Mumbai & Taj Palace Hotel, New Delhi, India
    3. Artists Against Communalism, Mumbai, India
    4. Art for CRY, Mumbai, Kolkata, New Delhi & Bengaluru, India
  35. 1996

    1. Annual Exhibition, Birla Academy of Art & Culture, Kolkata, India
    2. Harmony Show, Nehru Centre, Mumbai, India
    3. Urban Signals Shifting Images, Birla Academy of Arts & Culture, Kolkata & Mumbai, India
    4. 29 Oct 1996 to 15 Nov 1996

  36. 1997

    1. The Searching Spirit, Singapore
    2. Fifty Years of Art in Mumbai : 1941-91, National Gallery of Modern Art, Mumbai, India (Cu. Dr. Saryu Doshi)
    3. Image Beyond Image - The Masanori Fukuoka Collection, National Gallery of Modern Art, Mumbai, India
    4. Fifty Years of Freedom of Expression, organized by R.P.G., Jehangir Art Gallery, Mumbai, India
    5. Colours of Independence, National Gallery of Modern Art, New Delhi, India
    6. The Looking Glass Self, Lakeeren, Mumbai, India
    7. Rare and Important Paintings, The Classic Source & Sakshi Gallery, Mumbai, India
    8. The Search, Apparao Galleries, Chennai & New York, U.S.A.
    9. HEART : Intuitive Logic - II, Mumbai, India
  37. 1998

    1. Spirit and Soul : Indian Pantings Today, Hong Kong Land, Hong Kong
    2. Ruminations, Apparao Galleries, Mumbai, India
    3. A Collector's Eye, Jehangir Nicholson Collection, Jehangir Art Gallery, Mumbai, India
    4. Indian Contemporary Art, Leverkusen and Monheim, Germany (Presented by: RPG and Bayer)
    5. World wide fund for Nature, New Delhi, India
  38. 1999

    1. Flashback - Flashforward, Jehangir Art Gallery,Mumbai, India (Organised by: RPG Enterprices)
    2. The World is Round & Time is Cyclical, Art Today, New Delhi, India
    3. Art with a Heart, Rotary Club of Mumbai, Mumbai, India
    4. Prabhakar Barwe, S.H. Raza & J.A. Sabavala - Experiments in Stillness, The Window, Mumbai, India
    5. The Indian Fine Arts Society, Singapore
  39. 2000

    1. Harmony Show, Nehru Centre, Mumbai, India
    2. A Sorrowful Mystery, The Arts Trust (Chennai), National Gallery of Modern Art, Mumbai, India
    3. Distillations, Birla Academy of Art and Culture, Mumbai, India
    4. The Millennium Show, Nehru Centre, Mumbai, India
    5. RPG Collection, National Gallery of Modern Art (NGMA), Mumbai, India
  40. 2001

    1. Ideas and Images - Part III, National Gallery of Modern Art (NGMA), Mumbai, India
    2. Engendering Images of a Woman, Presented by The Guild Art Gallery, Mumbai, India
  41. 2002

    1. India: Contemporary Art from the Northeastern Private Collection, New Jersey, USA
  42. 2003

    1. Ideas and Images - Part III, National Gallery of Modern Art (NGMA), Mumbai, India
    2. Rain, Galerie International & Sakshi Art Gallery, Mumbai, India
  43. 2004

    1. The Jehangir Nicholson Collection, Mumbai, India
    2. The Search, Mumbai, India
    3. Ideas and Images - Part III, National Gallery of Modern Art (NGMA), Mumbai, India
  44. 2005

    1. Trends and Techniques: Water Colour in India, Galerie 88, Kolkata, India
  45. 2007

    1. Inaugural Show new space, colaba, Sakshi Gallery, Mumbai, India
  46. 2009

    1. Bharat Ratna! Jewels of Modern Indian Art, Museum of Fine Arts, Boston, U.S.A.
    2. Master Class, The Arts Trust, Mumbai, India
    3. A Collection Of Small Works, Sakshi Gallery, Mumbai, India
    4. Gallery collection, Sakshi Gallery, Mumbai, India

      13 Jul 2009 to 29 Jul 2009

  47. 2010

    1. The Modernists, RL Fine Arts, New York, U.S.A.
    2. Evolve: 10th Anniversary Show, Tao Art Gallery, Mumbai, India
    3. Roots, Sakshi Gallery, Mumbai, India

      21 Jan 2010 to 23 Jan 2010

    4. Gallery Collection, Sakshi Gallery, Mumbai, India

      23 Feb 2010 to 12 Mar 2010

    5. Third Dimension, Sakshi Gallery, Mumbai, India

      07 Jun 2010 to 09 Jul 2010

    6. Roots, 25th Anniversary Exhibition of Sakshi Art Gallery, Mumbai at The Park, Chennai, India

      16 Sep 2010 to 18 Sep 2010

    7. Figure/Landscape: Part One, Aicon Gallery, New York, U.S.A.

      28 Oct 2010 to 20 Nov 2010

    8. On View, Sakshi Gallery, Mumbai, India

      25 Nov 2010 to 11 Dec 2010

    9. Figure/Landscape: Part Two, Aicon Gallery, London, U.K.

      03 Dec 2010 to 09 Jan 2011

  48. 2011

    1. Form and Formlessness, Art Alive Gallery, Gurgaon, India
    2. Roots in the Air, Branches Below: Modern & Contemporary Art from India, San Jose Museum of Art, San Jose, U.S.A.
    3. Masters Ltd: Limited Editions, Gallery Beyond, Mumbai, India
    4. Ethos V: Indian Art Through the Lens of History (1900 to 1980), Indigo Blue Art, Singapore
    5. India Art Summit, Sakshi Gallery, Mumbai, India

      19 Jan 2011 to 22 Jan 2011

    6. High-Light, at The Oberoi, Mumbai, India (Presented by: Sakshi Gallery)

      06 May 2011

    7. Anecdotes, Sakshi Gallery, Mumbai, India

      04 Jul 2011 to 29 Jul 2011

    8. Remembering Jehangir Sabavala, Sakshi Gallery, Mumbai, India

      01 Sep 2010 to 09 Sep 2011

  49. 2012

    1. Sightings, Sakshi Gallery, Mumbai, India

      11 Jan 2012 to 10 Feb 2012

    2. Contemporary: A Selection of Modern and Contemporary Art, at The Park, Chennai, India (Prsented by: Sakshi Gallery)

      08 Mar 2012 to 10 Mar 2012

    3. Through the Ages: South Asian Sculpture and Painting from Antiquity to Modernism, Aicon Gallery, New York, U.S.A.

      16 Mar 2012 to 12 May 2012

    4. Iconic Processions, Aicon Gallery, New York, U.S.A.

      11 Sep 2011 to 20 Oct 2012

    5. Manifestations VIII-20th century Indian Art, Delhi Art Gallery, New Delhi, India

      22 Nov 2012 to 29 Dec 2012

    6. Diva, Sakshi Gallery, Mumbai, India

      30 Nov 2012 to 14 Jan 2013

  50. 2014

    1. Immutable Gaze Part I: Masterpieces of Modern and Pre-Modern Indian Art, aicon Gallery, New York, U.S.A.

      14 Mar 2014 to 12 Apr 2014

    2. Shifting the Paradigm, Aicon Gallery, Greenwich Village, New York, U.S.A.

      12 Sep 2014 to 18 Oct 2014

  51. 2015

    1. INDIA MODERN, Narratives from 20th Century Indian Art, DAG, New York, U.S.A.

      18 Mar 2015 to 06 Jun 2015

    2. Art Exchange, Sakshi Gallery, Mumbai, India

      01 Jul 2015 to 06 Aug 2015

    3. INDIA MODERN, Narratives from 20th Century Indian Art, DAG, New Delhi, India

      13 Jul 2024 to 12 Sep 2015

    4. INDIA MODERN, Narratives from 20th Century Indian Art, DAG

      25 Sep 2015 to 05 Dec 2015

  52. 2017

    1. Masterpieces of Indian Modern Art. Edition II, Delhi Art Gallery, New Delhi, India

      01 Mar 2017 to 30 Jun 2017

    2. Easy Buy @ Sakshi Salon, Colaba, Sakshi Gallery, Mumbai, India

      11 May 2017 to 31 May 2017

  53. 2018

    1. India's French Connection,Indian Artists in France Delhi Art Gallery, New Delhi, India
    2. NEW CONFIGURATIONS vignettes from the collection in recent years, Kiran Nadar Museum of Art, Noida, India

      27 Apr 2018 to 20 Dec 2018

    3. AD Design Show, Delhi Art Gallery Mumbai, India

      26 Oct 2018 to 28 Oct 2018

    4. India's French Connection,Indian Artists in France Delhi Art Gallery, New York, U.S.A.

      14 Nov 2018 to 08 Mar 2019

  54. 2019

    1. The Print Chamber, Kalakriti Art Gallery, Hyderabad, India

      14 Sep 2019 to 26 Sep 2019

  55. 2023

    1. Remembering: 60 Years of Gallery Chemould, Chemould Prescott Road, Mumbai, India

      31 Oct 2023 to 05 Nov 2023

  56. 2024

    1. Iconic, Masterpieces of Indian Modern Art Edition 04, DAG, New Delhi, India

      21 Dec 2024 to 30 Jan 2025

Gallery Chemould (Organiser). Collectors' Choice, 1985 | Group Exhibition Invitation | 00858793
1 / 3

Gallery Chemould (Organiser). Collectors' Choice, 1985 | Group Exhibition Invitation | 00858793

Integrated Timeline

74 entries

Chronicled Highlights 261955 – 2016

Jehangir Sabavala was born in 1922 in Bombay, Maharashtra, India.
1955
Public Auction HighPainting
Sotheby's · Indian Miniatures The Travel Sale - India and The Far East Modern and Contemporary South Asian PaintingsLondon · 08 June 2000
In 2000, the artist achieved a new high in the auction market with the sale of Benkei II (1955), offered in the Indian Miniatures The Travel Sale - India and The Far East Modern and Contemporary South Asian Paintings by Sotheby's, which concluded on 08 June 2000 at London, achieving a sale price of ₹8,94,768 ($19,981). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Benkei II, 1955 | Painting
Selling price
INR8,94,768
88% above high estimate
Estimate
INR 3,40,216 – 4,76,302
Rate per sq in
INR 1,322
Medium
Oil on canvas
Dimensions
22 × 30.7 in (56 × 78 cm)
Lot
218 · So.Lon/08.06.00
1956
Public Auction HighPainting
Christie's · Indian and Southeast Asian Art: Including 20th Century Indian PaintingsNew York · 23 September 2004
In 2004, the artist achieved a new high in the auction market with the sale of White Bougainvillaea (1956), offered in the Indian and Southeast Asian Art: Including 20th Century Indian Paintings by Christie's, which concluded on 23 September 2004 at New York, achieving a sale price of ₹30,19,407 ($65,725). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). White Bougainvillaea, 1956 | Painting
Selling price
INR30,19,407
119% above high estimate
Estimate
INR 11,48,500 – 13,78,200
Rate per sq in
INR 3,460
Medium
Oil on board
Dimensions
33.7 × 25.9 in (86 × 66 cm)
Lot
210 · Ch.NeY/23.09.04
1962
Public Auction HighPainting
Sotheby's · Islamic and Indian ArtLondon · 27 April 1995
In 1995, the artist achieved a new high in the auction market with the sale of Evenfall (1962), offered in the Islamic and Indian Art by Sotheby's, which concluded on 27 April 1995 at London, achieving a sale price of ₹1,86,171 ($5,931). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Evenfall, 1962 | Painting
Selling price
INR1,86,171
Within estimate
Estimate
INR 1,51,770 – 2,02,360
Rate per sq in
INR 158
Medium
Oil on canvas
Dimensions
37 × 31.9 in (94 × 81 cm)
Lot
247 · So.Lon/27.04.95
1962
Literary ReferencePainting
DeRivaz & Ives · Indian Modern Fine ArtsOnline · 22 January 2022
Between 1961 and 1964, Sabavala attempted to break away from the suffocating formality of Synthetic Cubism; and in this, he found a remedial alternative in the work of Lyonel Feininger, who had died in 1956. Moving gradually from Lhote’s austerity of line to Feininger’s glissando Cubism, he softened his paintings; the indispensable presence of illumination became his subject: “Through Feininger’s pure, precise and yet very delicate and personal renderings of cloud and boat and sea, I discovered the joys of extending form into the beauty and clarity of ligHe.”
Sabavala, Jehangir (Artist). Untitled, 1962 | Painting
Selling price
INR2,91,20,000
Below low estimate
Estimate
INR 3,00,00,000 – 4,50,00,000
Rate per sq in
INR 16,999
Medium
Oil on canvas
Dimensions
31.9 × 53.7 in (81 × 136 cm)
Lot
14 · De.Onl/22.01.22
Research Categories
02Modern and Contemporary Indian Fine Arts
1963
Public Auction HighPainting
Sotheby's · Modern & Contemporary South Asian ArtNew York · 17 March 2025
In 2025, the artist achieved a new high in the auction market with the sale of The Journey of the Magi (1963), offered in the Modern & Contemporary South Asian Art by Sotheby's, which concluded on 17 March 2025 at New York, achieving a sale price of ₹23,72,89,328 ($2,734,000). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). The Journey of the Magi, 1963 | Painting
Selling price
INR23,72,89,328
128% above high estimate
Estimate
INR 5,20,75,200 – 10,41,50,400
Rate per sq in
INR 1,84,505
Medium
Oil on canvas
Dimensions
41.1 × 31.3 in (105 × 79 cm)
Signature
S/d 'Sabavala '63' l.r.
Lot
9 · So.NeY/17.03.25
Provenance
Acquired directly from the artist by Khorshed and Dara Karanjavala, circa early 1960s Thence by descent
1965
Public Auction HighPainting
Christie's · International Modern & Contemporary Art: Including Arab Indian, Iranian and Western ArtDubai · 24 May 2006
In 2006, the artist achieved a new high in the auction market with the sale of The Tree (1965), offered in the International Modern & Contemporary Art: Including Arab Indian, Iranian and Western Art by Christie's, which concluded on 24 May 2006 at Dubai, achieving a sale price of ₹54,87,600 ($120,000). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). The Tree, 1965 | Painting
Selling price
INR54,87,600
140% above high estimate
Estimate
INR 18,29,200 – 22,86,500
Rate per sq in
INR 4,795
Medium
Oil on Canvas
Dimensions
40.9 × 28 in (104 × 71 cm)
Lot
53 · Ch.Dub/24.05.06
1965
Public Auction HighPainting
Christie's · South Asian Modern + Contemporary ArtNew York · 22 September 2021
In 2021, the artist achieved a new high in the auction market with the sale of The Embarkation (1965), offered in the South Asian Modern + Contemporary Art by Christie's, which concluded on 22 September 2021 at New York, achieving a sale price of ₹11,73,46,134 ($1,590,000). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). The Embarkation, 1965 | Painting
Selling price
INR11,73,46,134
218% above high estimate
Estimate
INR 2,21,40,780 – 3,69,01,300
Rate per sq in
INR 86,149
Medium
Oil on canvas
Dimensions
42.2 × 32.2 in (107 × 82 cm)
Lot
624 · Ch.NeY/22.09.21
Research Categories
02Modern and Contemporary Indian Fine Arts
1966
Public Auction HighPainting
Saffronart · Winter Online Auction: Modern and Contemporary Indian ArtOnline · 08 December 2005
In 2005, the artist achieved a new high in the auction market with the sale of Black Lilies (1966), offered in the Winter Online Auction: Modern and Contemporary Indian Art by Saffronart, which concluded on 08 December 2005 at Online, achieving a sale price of ₹35,09,000 ($75,739). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Black Lilies, 1966 | Painting
Selling price
INR35,09,000
99% above high estimate
Estimate
INR 15,40,000 – 17,60,000
Rate per sq in
INR 3,986
Medium
Oil on canvas
Dimensions
40 × 22 in (102 × 56 cm)
Lot
30 · Sa.Onl/08.12.05
1968
Public Auction HighPainting
Bonhams · Modern and Contemporary South Asian ArtLondon · 07 June 2012
In 2012, the artist achieved a new high in the auction market with the sale of Vespers I (1968), offered in the Modern and Contemporary South Asian Art by Bonhams, which concluded on 07 June 2012 at London, achieving a sale price of ₹2,15,82,446 ($391,373). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Vespers I, 1968 | Painting
Selling price
INR2,15,82,446
69% above high estimate
Estimate
INR 85,22,190 – 1,27,83,285
Rate per sq in
INR 12,646
Medium
Oil on canvas
Dimensions
47.6 × 35.8 in (121 × 91 cm)
Signature
S/d '68 l.l.
Lot
20 · Bon.Lon/07.06.12
Research Categories
02Modern and Contemporary Indian Fine Arts
1971
Public Auction HighPainting
Saffronart · Live Auction: Modern Indian ArtNew Delhi · 04 September 2014
In 2014, the artist achieved a new high in the auction market with the sale of The Flight Into Egypt - I (1971), offered in the Live Auction: Modern Indian Art by Saffronart, which concluded on 04 September 2014 at New Delhi, achieving a sale price of ₹3,00,00,000 ($496,245.08). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). The Flight Into Egypt - I, 1971 | Painting
Selling price
INR3,00,00,000
233% above high estimate
Estimate
INR 80,00,000 – 90,00,000
Rate per sq in
INR 20,678
Medium
Oil on canvas
Dimensions
50 × 29 in (127 × 74 cm)
Lot
65 · Sa.Del/04.09.14
1978
Public Auction HighPainting
Saffronart · Modern and Contemporary Paintings by Nine Masters: Spring Online AuctionOnline · 02 March 2005
In 2005, the artist achieved a new high in the auction market with the sale of Off Tree And Tree (1978), offered in the Modern and Contemporary Paintings by Nine Masters: Spring Online Auction by Saffronart, which concluded on 02 March 2005 at Online, achieving a sale price of ₹32,31,265 ($73,942). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Off Tree And Tree, 1978 | Painting
Selling price
INR32,31,265
29% above high estimate
Estimate
INR 20,00,000 – 25,00,000
Rate per sq in
INR 1,762
Medium
Oil on canvas
Dimensions
33.5 × 54.7 in (85 × 139 cm)
Lot
14 · Sa.Onl/02.03.05
1981
Public Auction HighPainting
Christie's · South Asian Modern + Contemporary ArtNew York · 23 September 2020
In 2020, the artist achieved a new high in the auction market with the sale of The Peasants (1981), offered in the South Asian Modern + Contemporary Art by Christie's, which concluded on 23 September 2020 at New York, achieving a sale price of ₹7,11,23,971.8 ($966,000). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). The Peasants, 1981 | Painting
Selling price
INR7,11,23,972
61% above high estimate
Estimate
INR 3,31,32,285 – 4,41,76,380
Rate per sq in
INR 31,345
Medium
Oil on canvas
Dimensions
54 × 42 in (137 × 107 cm)
Lot
507 · Ch.NeY/23.09.20
1988
Public Auction HighPainting
Sotheby's · Indian Art: Including Miniatures and Modern PaintingsNew York · 22 March 2007
In 2007, the artist achieved a new high in the auction market with the sale of Storm III (1988), offered in the Indian Art: Including Miniatures and Modern Paintings by Sotheby's, which concluded on 22 March 2007 at New York, achieving a sale price of ₹1,15,26,240 ($264,000). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Storm III, 1988 | Painting
Selling price
INR1,15,26,240
76% above high estimate
Estimate
INR 52,39,200 – 65,49,000
Rate per sq in
INR 5,138
Medium
Oil on canvas
Dimensions
38.5 × 58.3 in (98 × 148 cm)
Lot
85 · So.NeY/22.03.07
1992
Image 1/2
First Auction Appearance | BOOK.AUCPainting
Sotheby's · Indian European and Oriental Paintings and Works of ArtNew Delhi · 09 October 1992
On 09 October 1992, made their debut in the Indian public auction market when Of Cliff and Fall-V was presented as Lot in Indian European and Oriental Paintings and Works of Art, conducted by Sotheby's in New Delhi, India. This auction marked the artist's first recorded appearance in the public auction market, establishing the earliest chapter of their auction history.
Sabavala, Jehangir (Artist). Of Cliff and Fall-V, 1978 | Painting
Selling price
INR1,10,000
Within estimate
Estimate
INR 1,00,000 – 1,50,000
Rate per sq in
INR 48.74
Medium
Oil on canvas
Dimensions
55.1 × 40.9 in (140 × 104 cm)
Lot
178 · So.Del/09.10.92
1993
Public Auction HighPainting
Christie's · Indian Contemporary Paintings: Islamic Works of Art and Indian, Himalaya and South-East Asian ArtLondon · 16 October 1995
In 1995, the artist achieved a new high in the auction market with the sale of Kumaon Sky (1993), offered in the Indian Contemporary Paintings: Islamic Works of Art and Indian, Himalaya and South-East Asian Art by Christie's, which concluded on 16 October 1995 at London, achieving a sale price of ₹3,00,288 ($8,757). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Kumaon Sky, 1993 | Painting
Selling price
INR3,00,288
11% above high estimate
Estimate
INR 2,16,300 – 2,70,375
Rate per sq in
INR 114
Medium
Oil on canvas
Dimensions
60 × 44 in (152 × 112 cm)
Lot
19 · Ch.Lon/16.10.95
1996
Public Auction HighPainting
Christie's · Indian Contemporary ArtLondon · 04 June 1997
In 1997, the artist achieved a new high in the auction market with the sale of Pilgrimage II (1996), offered in the Indian Contemporary Art by Christie's, which concluded on 04 June 1997 at London, achieving a sale price of ₹4,03,892 ($11,290). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Pilgrimage II, 1996 | Painting
Selling price
INR4,03,892
Below low estimate
Estimate
INR 4,09,745 – 5,85,350
Rate per sq in
INR 168
Medium
Oil on canvas
Dimensions
59.8 × 40.2 in (152 × 102 cm)
Lot
115 · Ch.Lon/04.06.97
1998
Public Auction HighPainting
Asta Guru · Historic MasterpiecesMumbai · 16 December 2024
In 2024, the artist achieved a new high in the auction market with the sale of Untitled (1998), offered in the Historic Masterpieces by Asta Guru, which concluded on 16 December 2024 at Mumbai, achieving a sale price of ₹15,81,95,955 ($1,864,948.74). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Untitled, 1998 | Painting
Selling price
INR15,81,95,955
352% above high estimate
Estimate
INR 2,50,00,000 – 3,50,00,000
Rate per sq in
INR 87,887
Medium
Oil on canvas
Dimensions
30 × 60 in (76 × 152 cm)
Signature
S/d: Bottom Left
Lot
131 · AG.Mum/16.12.24
Research Categories
02Modern and Contemporary Indian Fine Arts
1999
Public Auction HighPainting
Saffronart · Saffronart Online Auction: Modern Indian PaintingsOnline · 08 May 2003
In 2003, the artist achieved a new high in the auction market with the sale of Silent Volcano (1999), offered in the Saffronart Online Auction: Modern Indian Paintings by Saffronart, which concluded on 08 May 2003 at Online, achieving a sale price of ₹11,94,270 ($25,270). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Silent Volcano, 1999 | Painting
Selling price
INR11,94,270
Within estimate
Estimate
INR 10,75,000 – 12,75,000
Rate per sq in
INR 554
Medium
Oil on canvas
Dimensions
36 × 59.8 in (92 × 152 cm)
Lot
26 · Sa.Onl/08.05.03
1999
Public Auction HighPainting
Sotheby's · Indian Art: Including Miniatures and Modern Indian PaintingsNew York · 19 September 2006
In 2006, the artist achieved a new high in the auction market with the sale of Crucifixion (1999), offered in the Indian Art: Including Miniatures and Modern Indian Paintings by Sotheby's, which concluded on 19 September 2006 at New York, achieving a sale price of ₹66,39,840 ($144,000). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Crucifixion, 1999 | Painting
Selling price
INR66,39,840
20% above high estimate
Estimate
INR 36,88,800 – 55,33,200
Rate per sq in
INR 3,239
Medium
Oil on canvas
Dimensions
45.3 × 45.3 in (115 × 115 cm)
Lot
96 · So.NeY/19.09.06
2001
Public Auction HighPainting
Saffronart · Modern Indian Paintings: Winter Online AuctionOnline · 02 December 2004
In 2004, the artist achieved a new high in the auction market with the sale of Women In Grey (2001), offered in the Modern Indian Paintings: Winter Online Auction by Saffronart, which concluded on 02 December 2004 at Online, achieving a sale price of ₹29,50,875 ($66,732). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Women In Grey, 2001 | Painting
Selling price
INR29,50,875
18% above high estimate
Estimate
INR 20,00,000 – 25,00,000
Rate per sq in
INR 1,367
Medium
Oil on canvas
Dimensions
60 × 36 in (152 × 91 cm)
Lot
31 · Sa.Onl/02.12.04
2002
Public Auction HighPainting
Saffronart · Modern & Contemporary Indian Art: Summer Online AuctionOnline · 17 June 2010
In 2010, the artist achieved a new high in the auction market with the sale of The Casuarina Line I (2002), offered in the Modern & Contemporary Indian Art: Summer Online Auction by Saffronart, which concluded on 17 June 2010 at Online, achieving a sale price of ₹1,68,70,500 ($362,806). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). The Casuarina Line I, 2002 | Painting
Selling price
INR1,68,70,500
237% above high estimate
Estimate
INR 40,00,000 – 50,00,000
Rate per sq in
INR 11,862
Medium
Acrylic on canvas
Dimensions
29 × 49 in (74 × 125 cm)
Lot
42 · Sa.Onl/17.06.10
2002
Public Auction HighPainting
Christie's · The India SaleMumbai · 15 December 2015
In 2015, the artist achieved a new high in the auction market with the sale of The Casuarina Line II (2002), offered in the The India Sale by Christie's, which concluded on 15 December 2015 at Mumbai, achieving a sale price of ₹4,82,25,000 ($719,309.11). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). The Casuarina Line II, 2002 | Painting
Selling price
INR4,82,25,000
168% above high estimate
Estimate
INR 1,20,00,000 – 1,80,00,000
Rate per sq in
INR 32,150
Medium
Oil on canvas
Dimensions
30 × 50 in (76 × 127 cm)
Lot
38 · Ch.Mum/15.12.15
2004
Public Auction HighPainting
Saffronart · Modern Indian Art: Winter Online AuctionOnline · 07 December 2006
In 2006, the artist achieved a new high in the auction market with the sale of Untitled (The City - IV) (2004), offered in the Modern Indian Art: Winter Online Auction by Saffronart, which concluded on 07 December 2006 at Online, achieving a sale price of ₹95,78,250 ($214,470). This record marked a defining moment in the artist's market history, reflecting both the significance of the artwork and its reception within the broader art world.
Sabavala, Jehangir (Artist). Untitled (The City - IV), 2004 | Painting
Selling price
INR95,78,250
49% above high estimate
Estimate
INR 53,75,000 – 64,50,000
Rate per sq in
INR 4,507
Medium
Oil on canvas
Dimensions
35.7 × 59.4 in (91 × 151 cm)
Lot
8 · Sa.Onl/07.12.06
2005
Retrospective ExhibitionSolo Exhibition Catalogue
Jehangir Sabavala · Jehangir SabavalaNational Gallery of Modern Art · February 2006
In 2005, Jehangir Sabavala A Retrospective marked a major milestone in the exhibition history of Jehangir Sabavala, offering a retrospective survey of the artist's artistic production
Sabavala, Jehangir (Artist). Jehangir Sabavala, 2005 | Solo Exhibition Catalogue | 00882699
Research Categories3
02Modern and Contemporary Indian Fine Arts06Economics of Art & Cultural Industry12The History & Historiography of Scholarship in the Arts, Humanities, and Social Sciences
2012
Featured on Auction Catalogue Cover | Bon.Lon/07.06.12Auction Catalogue
Bonhams · Modern and Contemporary South Asian ArtLondon · 07 June 2012
In 2012, an artwork by Jehangir Sabavala was featured on the cover of Bonhams: Modern and Contemporary South Asian Art (June 2012, London), marking a documented highlight in the artist's public and auction market visibility.
Bonhams (Auction House). Modern and Contemporary South Asian Art. 07 June 2012 | Auction Catalogue
Lots offered
72
Lots sold
56 · 78%
Pages
109
Lot
Bon.Lon/07.06.12
Research Categories3
06Economics of Art & Cultural Industry02Modern and Contemporary Indian Fine Arts14India and her Relationship with the World
2016
Featured on Auction Catalogue Cover | Ar.Onl/21.03.16Auction Catalogue
Artiana · Modern and Contemporary South Asian ArtLondon · 21 March 2016
In 2016, an artwork by Jehangir Sabavala was featured on the cover of Artiana: Modern and Contemporary South Asian Art (March 2016, London), marking a documented highlight in the artist's public and auction market visibility.
Artiana (Auction House). Modern and Contemporary South Asian Art. 21 March 2016 | Auction Catalogue
Lots offered
60
Lots sold
48 · 80%
Pages
139
Lot
Ar.Onl/21.03.16
Research Categories3
06Economics of Art & Cultural Industry02Modern and Contemporary Indian Fine Arts14India and her Relationship with the World

Economics of Art

20 of 50
Currency
This section showcases auction lots that achieved record-high sale prices, tracked by the date each record was set based on the artist's historical auction data.

Record-high lots23

Public Auction Market (1987–2026) | Select Indicators

  1. Annual Auction Sale Turnover
  2. Average Sale Price Per Lot
  3. Square Inch Rate Trend
Currency

Annual Auction Sale Turnover

This indicator tracks the Total Annual Auction Sales value of Jehangir Sabavala’s artworks, beginning in 1987 through to the present.
It aggregates all sales across global auction houses into yearly totals.

Analysis reflected in the chart:
The turnover graph highlights periods of strong growth, moments of market correction, and resilience during downturns. Peaks often align with landmark works coming to public auction, while troughs may indicate reduced supply or weaker demand. Over time, the curve illustrates the overall trajectory of Jehangir Sabavala’s public auction market presence.

Average Sale Price Per Lot

This measure calculates the Average Sale Price of all lots by Jehangir Sabavala sold each year.
It smooths out fluctuations caused by the quantity of works offered and focuses on the Average Sale Price level per artwork.

Analysis reflected in the chart:
Rising average sale prices indicate growing collector confidence and a stronger willingness to pay higher amounts per work. Assuming the mix of mediums remains relatively stable over time, the proportion of works on paper typically priced lower than works on canvas adds important context to understanding these market movements.

Square Inch Rate Trend

The Square Inch Rate normalizes prices by the size of each artwork, showing the average sale value per square inch over time.
This allows fair comparisons between smaller works and larger canvases.

Analysis reflected in the chart:
The Square Inch Rate shown in the graph combines various medium types such as canvas, paper, board, and others. Historically, works on canvas and board have broadly commanded higher prices compared to works on paper.

  1. 1977

    1. Padmashree

      Government of India

  2. 1993

    1. Citation

      Art Society of India, Mumbai, India

  3. 2000

    1. Citation

      National Gallery of Modern Art, Mumbai, India

  4. 2001

    1. Kala Ratna

      All India Fine Arts & Crafts Society (AIFACS), New Delhi, India

  5. 2004

    1. Kala Ratna

      Lalit Kala Akademi

Research Centre

Unknown (Photographer), Bapsy Sabavala with elder son Sharokh and Jehangir, Paris, France, 1932, Contemporary Photograph
Unknown (Photographer). Bapsy Sabavala with elder son Sharokh and Jehangir, Paris, France, 1932 | Contemporary Photograph
Unknown (Photographer), Jehangir Sabavala as a child, 1932, Contemporary Photograph
Unknown (Photographer). Jehangir Sabavala as a child, 1932 | Contemporary Photograph
Unknown (Photographer), A Japanese dinner aboard the SS Asama Maru, America bound. A Purser with Bapsy, her friend Piroja and Jehangir, 1939, Contemporary Photograph
Unknown (Photographer). A Japanese dinner aboard the SS Asama Maru, America bound. A Purser with Bapsy, her friend Piroja and Jehangir, 1939 | Contemporary Photograph
Unknown (Photographer), Sabavala as 'Ishaak' in 'The Golden Journey to Samarkand', staged by the Elphinstone College Dramatics Society at the Cowasjee Jehangir Hall, Bombay, India, 1941, Contemporary Photograph
Unknown (Photographer). Sabavala as 'Ishaak' in 'The Golden Journey to Samarkand', staged by the Elphinstone College Dramatics Society at the Cowasjee Jehangir Hall, Bombay, India, Early 1940s | Contemporary Photograph
Jehangir Sabavala (Artist), Untitled, 1942, Painting
Sabavala, Jehangir (Artist). Untitled, 1942 | Painting
Jehangir Sabavala (Artist), Untitled, 1942, Drawing
Sabavala, Jehangir (Artist). Untitled, 1942 | Drawing
Jehangir Sabavala (Artist), The Festival, 1942, Painting
Sabavala, Jehangir (Artist). The Festival, c.1942 | Painting
Jehangir Sabavala (Artist), Untitled, 1942, Drawing
Sabavala, Jehangir (Artist). Untitled, 1942 | Drawing
Jehangir Sabavala (Artist), Untitled, 1942, Drawing
Sabavala, Jehangir (Artist). Untitled, 1942 | Drawing
Jehangir Sabavala (Artist), Roman Head, 1942, Painting
Sabavala, Jehangir (Artist). Roman Head, 1942 | Painting
Jehangir Sabavala (Artist), Untitled, 1942, Graphic Art
Sabavala, Jehangir (Artist). Untitled, 1942 | Graphic Art
Jehangir Sabavala (Artist), Plaster Cast, 1942, Drawing
Sabavala, Jehangir (Artist). Plaster Cast, 1942 | Drawing
Jehangir Sabavala (Artist), Before The Temple, 1943, Painting
Sabavala, Jehangir (Artist). Before The Temple, 1943 | Painting
Jehangir Sabavala (Artist), Untitled, 1943, Painting
Sabavala, Jehangir (Artist). Untitled, 1943 | Painting
Jehangir Sabavala (Artist), Nude Study, 1944, Drawing
Sabavala, Jehangir (Artist). Nude Study, 1944 | Drawing
Jehangir Sabavala (Artist), Maki, 1945, Painting
Sabavala, Jehangir (Artist). Maki, 1945 | Painting
Jehangir Sabavala (Artist), The Festival, 1945, Painting
Sabavala, Jehangir (Artist). The Festival, c. late 1940s | Painting
Jehangir Sabavala (Artist), Untitled, 1946, Drawing
Sabavala, Jehangir (Artist). Untitled, 1946 | Drawing
Jehangir Sabavala (Artist), Nude Studies, 1946, Painting
Sabavala, Jehangir (Artist). Nude Studies, 1946 | Painting
Jehangir Sabavala (Artist), Seated Nude, 1946, Drawing
Sabavala, Jehangir (Artist). Seated Nude, 1946 | Drawing
Jehangir Sabavala (Artist), Untitled, 1947, Drawing
Sabavala, Jehangir (Artist). Untitled, 1947 | Drawing
Jehangir Sabavala (Artist), Untitled (Nude), 1947, Drawing
Sabavala, Jehangir (Artist). Untitled (Nude), 1947 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Nude Study (Paris), 1948, Drawing
Sabavala, Jehangir (Artist). Nude Study (Paris), 1948 | Drawing
Jehangir Sabavala (Artist), Nude Study (Paris), 1948, Drawing
Sabavala, Jehangir (Artist). Nude Study (Paris), 1948 | Drawing
Jehangir Sabavala (Artist), Seated Nude - I, 1948, Painting
Sabavala, Jehangir (Artist). Seated Nude - I, 1948 | Painting
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing & Sketch
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing & Sketch
Jehangir Sabavala (Artist), Untitled, 1948, Painting
Sabavala, Jehangir (Artist). Untitled, 1948 | Painting
Jehangir Sabavala (Artist), Nanette, 1948, Drawing
Sabavala, Jehangir (Artist). Nanette, 1948 | Drawing
Jehangir Sabavala (Artist), Nanette, 1948, Drawing
Sabavala, Jehangir (Artist). Nanette, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Painting
Sabavala, Jehangir (Artist). Untitled, 1948 | Painting
Jehangir Sabavala (Artist), Hobo, 1948, Drawing
Sabavala, Jehangir (Artist). Hobo, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Standing Male Nude, 1948, Painting
Sabavala, Jehangir (Artist). Standing Male Nude, 1948 | Painting
Jehangir Sabavala (Artist), Standing Male Nude, 1948, Painting
Sabavala, Jehangir (Artist). Standing Male Nude, 1948 | Painting
Jehangir Sabavala (Artist), Nude Study, 1948, Painting
Sabavala, Jehangir (Artist). Nude Study, 1948 | Painting
Jehangir Sabavala (Artist), Still Life, 1948, Painting
Sabavala, Jehangir (Artist). Still Life, 1948 | Painting
Jehangir Sabavala (Artist), Nude Study, 1948, Drawing
Sabavala, Jehangir (Artist). Nude Study, 1948 | Drawing
Jehangir Sabavala (Artist), Self portrait, 1948, Painting
Sabavala, Jehangir (Artist). Self portrait, 1948 | Painting
Jehangir Sabavala (Artist), Untitled, 1949, Drawing
Sabavala, Jehangir (Artist). Untitled, 1949 | Drawing
Jehangir Sabavala (Artist), Nude, 1949, Painting
Sabavala, Jehangir (Artist). Nude, 1949 | Painting
Jehangir Sabavala (Artist), Reclining Nude, 1949, Drawing
Sabavala, Jehangir (Artist). Reclining Nude, 1949 | Drawing
Jehangir Sabavala (Artist), Untitled (Sculptor's Model), 1949, Painting
Sabavala, Jehangir (Artist). Untitled (Sculptor's Model), late 1940s | Painting
Jehangir Sabavala (Artist), Untitled, 1949, Painting
Sabavala, Jehangir (Artist). Untitled, 1949 | Painting
Jehangir Sabavala (Artist), Reclining Nude, 1949, Painting
Sabavala, Jehangir (Artist). Reclining Nude, 1949 | Painting
Jehangir Sabavala (Artist), Still Life with Apples, 1949, Painting
Sabavala, Jehangir (Artist). Still Life with Apples, 1949 | Painting
Jehangir Sabavala (Artist), Still Life with Apples, 1949, Painting
Sabavala, Jehangir (Artist). Still Life with Apples, 1949 | Painting
Jehangir Sabavala (Artist), Nude, 1949, Painting
Sabavala, Jehangir (Artist). Nude, 1949 | Painting
Jehangir Sabavala (Artist), Montenegran Gypsy, 1949, Painting
Sabavala, Jehangir (Artist). Montenegran Gypsy, 1949 | Painting
Jehangir Sabavala (Artist), Nue au Chale (Nude with Shawl), 1949, Painting
Sabavala, Jehangir (Artist). Nue au Chale (Nude with Shawl), 1949 | Painting
Jehangir Sabavala (Artist), Reclining Nude, 1949, Painting
Sabavala, Jehangir (Artist). Reclining Nude, 1949 | Painting
Jehangir Sabavala (Artist), Nude, 1949, Painting
Sabavala, Jehangir (Artist). Nude, 1949 | Painting
Jehangir Sabavala (Artist), Montenegran Gypsy, 1949, Painting
Sabavala, Jehangir (Artist). Montenegran Gypsy, 1949 | Painting
Jehangir Sabavala (Artist), Reclining Nude, 1949, Painting
Sabavala, Jehangir (Artist). Reclining Nude, 1949 | Painting
Jehangir Sabavala (Artist), Seated Nude IV, 1949, Painting
Sabavala, Jehangir (Artist). Seated Nude IV, 1949 | Painting
Unknown (Photographer), Jehangir (fifth from right) in a group photograph, Academie Julian, 1949, Contemporary Photograph
Unknown (Photographer). Jehangir (fifth from right) in a group photograph, Academie Julian, 1949 | Contemporary Photograph
Jehangir Sabavala (Artist), Untitled, 1950, Drawing
Sabavala, Jehangir (Artist). Untitled, 1950 | Drawing
Jehangir Sabavala (Artist), Untitled, 1950, Drawing
Sabavala, Jehangir (Artist). Untitled, 1950 | Drawing
Jehangir Sabavala (Artist), Le Chapelle Hank De Cagnes, 1950, Painting
Sabavala, Jehangir (Artist). Le Chapelle Hank De Cagnes, 1950 | Painting
Jehangir Sabavala (Artist), Still Life in Brown, 1950, Painting
Sabavala, Jehangir (Artist). Still Life in Brown, 1950 | Painting
Jehangir Sabavala (Artist), Nude Study, Woman Reclining, 1950, Painting
Sabavala, Jehangir (Artist). Nude Study, Woman Reclining, 1950 | Painting
Jehangir Sabavala (Artist), Flower Study, 1950, Painting
Sabavala, Jehangir (Artist). Flower Study, 1950 | Painting
Jehangir Sabavala (Artist), Untitled, 1950, Drawing
Sabavala, Jehangir (Artist). Untitled, 1950 | Drawing
Jehangir Sabavala (Artist), Garcon Assis, 1950, Painting
Sabavala, Jehangir (Artist). Garcon Assis, 1950 | Painting
Jehangir Sabavala (Artist), Nude Studies, 1950, Drawing
Sabavala, Jehangir (Artist). Nude Studies, 1950 | Drawing
Jehangir Sabavala (Artist), Leaves A Violin, 1950, Painting
Sabavala, Jehangir (Artist). Leaves A Violin, 1950 | Painting
Jehangir Sabavala (Artist), Garcon Assis, 1950, Painting
Sabavala, Jehangir (Artist). Garcon Assis, 1950 | Painting
Jehangir Sabavala (Writer), At the independent national show, 1950, Newspaper Clipping
Sabavala, Jehangir (Writer). At the independent national show, 01 July 1950 | Newspaper Clipping | 00728345
Reproduction albums in colors, 1950, Newspaper Clipping
Reproduction albums in colors, 01 May 1950 | Newspaper Clipping | 00728349
Jehangir Sabavala (Artist), Still Life with Fruit, 1950, Painting
Sabavala, Jehangir (Artist). Still Life with Fruit, 1949-1950 | Painting
Jehangir Sabavala (Artist), Still Life, 1950, Painting
Sabavala, Jehangir (Artist). Still Life, 1950 | Painting
Unknown (Photographer),  Andre Lhote's Studio, 1950, Contemporary Photograph
Unknown (Photographer). Andre Lhote's Studio, 1950 | Contemporary Photograph
Jehangir Sabavala (Artist), Jehangir Sabavala, 1951, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1951 | Solo Exhibition Catalogue | 00882686
Jehangir Sabavala (Artist), Portrait of Meher (The Grey Sari), 1951, Painting
Sabavala, Jehangir (Artist). Portrait of Meher (The Grey Sari), 1951 | Painting
Jehangir Sabavala (Artist), Jehangir Sabavala, 1951, Solo Exhibition Invitation
Sabavala, Jehangir (Artist) and Karl J. Khandalawalla (Organiser). Jehangir Sabavala, 1951 | Solo Exhibition Invitation | 00859858
Jehangir Sabavala (Artist), The White Veni, 1951, Painting
Sabavala, Jehangir (Artist). The White Veni, 1951 | Painting
Jehangir Sabavala (Artist), The Grey Sari, 1951, Painting
Sabavala, Jehangir (Artist). The Grey Sari, 1951 | Painting
Jehangir Sabavala (Artist), Untitled (Still Life), 1952, Painting
Sabavala, Jehangir (Artist). Untitled (Still Life), 1952 | Painting
Jehangir Sabavala (Artist), Untitled (Boats in Harbor), 1952, Painting
Sabavala, Jehangir (Artist). Untitled (Boats in Harbor), 1952 | Painting
Jehangir Sabavala (Artist), Self portrait, 1952, Painting
Sabavala, Jehangir (Artist). Self portrait, 1952 | Painting
Jehangir Sabavala (Artist), Jehangir Sabavala, 1953, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1953 | Solo Exhibition Invitation | 00859584
Chitra (Essayist), Studies in Development of J. Sabavala, 1953, Essay
Chitra (Essayist). Studies in Development of J. Sabavala. In Marg. 6(2). April 1953 | Essay | 00668813
Jehangir Sabavala (Artist), Portofino, 1953, Painting
Sabavala, Jehangir (Artist). Portofino, 1953 | Painting
Untitled, 1953, Newspaper Clipping
Untitled, 1953 | Newspaper Clipping | 00728520
Jehangir Sabavala (Artist), Portrait of Shirin, 1953, Painting
Sabavala, Jehangir (Artist). Portrait of Shirin, 1953 | Painting
Jehangir Sabavala (Artist), Capri Hillside, 1954, Painting
Sabavala, Jehangir (Artist). Capri Hillside, 1954 | Painting
Jehangir Sabavala (Artist), The Faraglioni, 1954, Painting
Sabavala, Jehangir (Artist). The Faraglioni, 1954 | Painting
Jehangir Sabavala (Artist), The Four Milk-Maids, 1954, Painting
Sabavala, Jehangir (Artist). The Four Milk-Maids, 1954 | Painting
Jehangir Sabavala (Artist), The Bangle Sellers, 1954, Painting
Sabavala, Jehangir (Artist). The Bangle Sellers, 1954 | Painting
Jehangir Sabavala (Artist), The Faraglioni, Capri, 1954, Painting
Sabavala, Jehangir (Artist). The Faraglioni, Capri, 1954 | Painting
Untitled, 1954, Newspaper Clipping
Untitled, December 1954 | Newspaper Clipping | 00728355
Jehangir Sabavala (Artist), Positano, 1954, Painting
Sabavala, Jehangir (Artist). Positano, 1954 | Painting
Jehangir Sabavala (Artist), Benkei II, 1955, Painting
Sabavala, Jehangir (Artist). Benkei II, 1955 | Painting
Jehangir Sabavala (Artist), The Madonna, 1955, Painting
Sabavala, Jehangir (Artist). The Madonna, 1955 | Painting
Jehangir Sabavala (Artist), Untitled (Portrait Of A Lady), 1955, Painting
Sabavala, Jehangir (Artist). Untitled (Portrait Of A Lady), c.1950s | Painting
Jehangir Sabavala (Artist), An Egyptian Reverie, 1955, Painting
Sabavala, Jehangir (Artist). An Egyptian Reverie, 1955 | Painting
Jehangir Sabavala (Artist), Untitled (Matheran), 1955, Painting
Sabavala, Jehangir (Artist). Untitled (Matheran), c.early 1950s | Painting
Jehangir Sabavala (Artist), Fisher-Folk Madh Island, 1955, Painting
Sabavala, Jehangir (Artist). Fisher-Folk Madh Island, 1955 | Painting
Jehangir Sabavala (Artist), Benkei, the Warrior Priest II, 1955, Painting
Sabavala, Jehangir (Artist). Benkei, the Warrior Priest II, 1955 | Painting
Jehangir Sabavala (Artist), Benkei, the Warrior Priest I, 1955, Painting
Sabavala, Jehangir (Artist). Benkei, the Warrior Priest I, 1955 | Painting
Jehangir Sabavala (Artist), Objects Composed, 1955, Painting
Sabavala, Jehangir (Artist). Objects Composed, 1955 | Painting
Jehangir Sabavala (Artist), Sous-Marin (Underwater), 1956, Painting
Sabavala, Jehangir (Artist). Sous-Marin (Underwater), 1956 | Painting
Mulk Raj Anand (General Editor), Marg, 1956, Magazine
Anand, Mulk Raj (General Editor). Marg, December 1956 | Magazine | 00760198
Richard Lannoy (Essayist), Jehangir Sabavala, 1956, Essay
Lannoy, Richard (Essayist). Jehangir Sabavala. In Marg. 10(1). December 1956 | Essay | 00668844
Jehangir Sabavala (Artist), The Waterpump, Jaipur, 1956, Painting
Sabavala, Jehangir (Artist). The Waterpump, Jaipur, 1956 | Painting
Jehangir Sabavala (Artist), White Bougainvillaea, 1956, Painting
Sabavala, Jehangir (Artist). White Bougainvillaea, 1956 | Painting
Jehangir Sabavala (Writer), Why do I Paint?-IV, 1956, Newspaper Clipping
Sabavala, Jehangir (Writer). Why do I Paint?-IV, 25 March 1956 | Newspaper Clipping | 00728290
Jehangir Sabavala (Artist), Young Man, 1956, Drawing
Sabavala, Jehangir (Artist). Young Man, 1956 | Drawing
Jehangir Sabavala (Artist), The Time of Day, 1956, Painting
Sabavala, Jehangir (Artist). The Time of Day, 1956 | Painting
Jehangir Sabavala (Artist), The Pavement Dwellers, 1956, Painting
Sabavala, Jehangir (Artist). The Pavement Dwellers, 1956 | Painting
Jehangir Sabavala (Artist), A Village Gathering, Rajasthan, 1956, Painting
Sabavala, Jehangir (Artist). A Village Gathering, Rajasthan, 1956 | Painting
Jehangir Sabavala (Artist), Canna-heads and Swan, 1957, Painting
Sabavala, Jehangir (Artist). Canna-heads and Swan, 1957 | Painting
Jehangir Sabavala (Artist), Earthenware and Fruit, 1958, Painting
Sabavala, Jehangir (Artist). Earthenware and Fruit, 1958 | Painting
Jehangir Sabavala (Artist), Jehangir Sabavala, 1958, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1958 | Solo Exhibition Catalogue | 00882687
Jehangir Sabavala (Artist), Jehangir Sabavala, 1958, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1958 | Solo Exhibition Invitation | 00859585
Jehangir Sabavala (Artist), Winged Flight, 1958, Painting
Sabavala, Jehangir (Artist). Winged Flight, 1958 | Painting
Jehangir Ardeshir Sabavala (Writer), Untitled, 1958, Newspaper Clipping
Sabavala, Jehangir Ardeshir (Writer). Untitled, December 1958 | Newspaper Clipping | 00728363
The Art of Jehangir Sabavala, 1958, Newspaper Clipping
The Art of Jehangir Sabavala, 23 November 1958 | Newspaper Clipping | 00728272
Jehangir Sabavala, 1958, Newspaper Clipping
Jehangir Sabavala, November 1958 | Newspaper Clipping | 00728299
Jehangir Sabavala (Artist), Crucifixion I, 1958, Painting
Sabavala, Jehangir (Artist). Crucifixion I, 1958 | Painting
Jehangir Sabavala (Artist), The Madonna of the Holy Ghost, 1958, Painting
Sabavala, Jehangir (Artist). The Madonna of the Holy Ghost, 1958 | Painting
Jehangir Sabavala (Artist), Jugs In Consonance, 1959, Painting
Sabavala, Jehangir (Artist). Jugs In Consonance, 1959 | Painting
Jehangir Sabavala (Artist), Butterflies Over Pink Blossoms, 1959, Painting
Sabavala, Jehangir (Artist). Butterflies Over Pink Blossoms, 1959 | Painting
Jehangir Sabavala (Artist), Sundown, 1959, Painting
Sabavala, Jehangir (Artist). Sundown, 1959 | Painting
Jehangir Sabavala (Artist), Earthenware, 1959, Painting
Sabavala, Jehangir (Artist). Earthenware, 1959 | Painting
Jehangir Sabavala (Artist), The Descent from the Cross, 1959, Painting
Sabavala, Jehangir (Artist). The Descent from the Cross, 1959 | Painting
The Art of Jehangir Sabavala, 1959, Newspaper Clipping
The Art of Jehangir Sabavala, February 1959 | Newspaper Clipping | 00728342
Jehangir Sabavala, 1959, Newspaper Clipping
Jehangir Sabavala, 1959 | Newspaper Clipping | 00728319
Jehangir Sabavala (Artist), Jugs in Consonance, 1959, Painting
Sabavala, Jehangir (Artist). Jugs in Consonance, 1959 | Painting
Jehangir Sabavala (Artist), Pieta, 1959, Painting
Sabavala, Jehangir (Artist). Pieta, 1959 | Painting
Jehangir Sabavala (Artist), Under Sail, 1959, Painting
Sabavala, Jehangir (Artist). Under Sail, 1959 | Painting
Jehangir Sabavala (Artist), On The Brink Of The Forest, 1960, Painting
Sabavala, Jehangir (Artist). On The Brink Of The Forest, 1960 | Painting
Jehangir Sabavala (Artist), Of Ships and Stars, 1960, Painting
Sabavala, Jehangir (Artist). Of Ships and Stars, 1960 | Painting
Jehangir Sabavala (Artist), Incarnadine, 1960, Painting
Sabavala, Jehangir (Artist). Incarnadine, 1960 | Painting
A.S. Raman (Writer), Themes in modern indian art, 1960, Newspaper Clipping
Raman, A.S. (Writer). Themes in modern indian art, 17 April 1960 | Newspaper Clipping | 00728305
Jehangir Sabavala (Artist), Untitled, 1960, Painting
Sabavala, Jehangir (Artist). Untitled, 1960 | Painting
Jehangir Sabavala (Artist), Cobra Lilies, 1960, Painting
Sabavala, Jehangir (Artist). Cobra Lilies, 1960 | Painting
Jehangir Sabavala (Artist), Treescape - Mahabaleshwar, 1960, Painting
Sabavala, Jehangir (Artist). Treescape - Mahabaleshwar, 1960 | Painting
Jehangir Sabavala (Artist), Sunflowers, 1960, Painting
Sabavala, Jehangir (Artist). Sunflowers, 1960 | Painting
Jehangir Sabavala (Artist), Incarnadine, 1960, Painting
Sabavala, Jehangir (Artist). Incarnadine, 1960 | Painting
Jehangir Sabavala (Artist), Treescape, 1960, Painting
Sabavala, Jehangir (Artist). Treescape, 1960 | Painting
Jehangir Sabavala (Artist), Musicians, 1960, Painting
Sabavala, Jehangir (Artist). Musicians, 1960 | Painting
Jehangir Sabavala (Artist), Sanchi, 1960, Painting
Sabavala, Jehangir (Artist). Sanchi, 1960 | Painting
Jehangir Sabavala (Artist), Empoli Glass, 1961, Painting
Sabavala, Jehangir (Artist). Empoli Glass, 1961 | Painting
Jehangir Sabavala (Artist), Still Life with Bottles, 1961, Painting
Sabavala, Jehangir (Artist). Still Life with Bottles, 1961 | Painting
Jehangir Sabavala (Artist), Still life with Bottles, 1961, Painting
Sabavala, Jehangir (Artist). Still life with Bottles, 1961 | Painting
Jehangir Sabavala (Artist), Still-Life with Bottles, 1961, Painting
Sabavala, Jehangir (Artist). Still-Life with Bottles, 1961 | Painting
Jehangir Sabavala (Artist), And Wilt Thou Leave Me Thus, 1961, Painting
Sabavala, Jehangir (Artist). And Wilt Thou Leave Me Thus, 1961 | Painting
Jehangir Sabavala (Artist), Jehangir Sabavala, 1962, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1962 | Solo Exhibition Catalogue | 00882688
Jehangir Sabavala (Artist), Jehangir Sabavala, 1962, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1962 | Solo Exhibition Invitation | 00859586
Jehangir Sabavala (Artist), Marine Encounter, 1962, Painting
Sabavala, Jehangir (Artist). Marine Encounter, 1962 | Painting
Jehangir Sabavala (Artist), Missile, 1962, Painting
Sabavala, Jehangir (Artist). Missile, 1962 | Painting
Jehangir Sabavala (Artist), Down to a Sunless Sea, 1962, Painting
Sabavala, Jehangir (Artist). Down to a Sunless Sea, 1962 | Painting
Jehangir Sabavala (Artist), Down to a Sunless Sea, 1962, Painting
Sabavala, Jehangir (Artist). Down to a Sunless Sea, 1962 | Painting
Jehangir Sabavala (Artist), Beached Boats, 1962, Painting
Sabavala, Jehangir (Artist). Beached Boats, 1962 | Painting
Jehangir Sabavala (Artist), Evenfall, 1962, Painting
Sabavala, Jehangir (Artist). Evenfall, 1962 | Painting
Jehangir Sabavala (Artist), Untitled, 1962, Painting
Sabavala, Jehangir (Artist). Untitled, 1962 | Painting
Jehangir Sabavala (Artist), Heat Haze, 1962, Painting
Sabavala, Jehangir (Artist). Heat Haze, 1962 | Painting
Jehangir Sabavala (Artist), The Journey of the Magi, 1963, Painting
Sabavala, Jehangir (Artist). The Journey of the Magi, 1963 | Painting
Jehangir Sabavala (Artist), Jehangir Sabavala, 1963, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1963 | Solo Exhibition Invitation | 00859587
Jehangir Sabavala (Artist), The Thundercloud, 1963, Painting
Sabavala, Jehangir (Artist). The Thundercloud, 1963 | Painting
Jehangir Sabavala (Artist), The Radiant Spheres, 1963, Painting
Sabavala, Jehangir (Artist). The Radiant Spheres, 1963 | Painting
Jehangir Sabavala (Artist), The Intangible Menace, 1963, Painting
Sabavala, Jehangir (Artist). The Intangible Menace, 1963 | Painting
Jehangir Sabavala (Artist), In the World's Afterlight, 1963, Painting
Sabavala, Jehangir (Artist). In the World's Afterlight, 1963 | Painting
Jehangir Sabavala (Artist), The Journey of Magi, 1963, Painting
Sabavala, Jehangir (Artist). The Journey of Magi, 1963 | Painting
Jehangir Sabavala (Artist), Golden Flight, 1963, Painting
Sabavala, Jehangir (Artist). Golden Flight, 1963 | Painting
Jehangir Sabavala (Artist), White Forms on an Azure Light, 1963, Painting
Sabavala, Jehangir (Artist). White Forms on an Azure Light, 1963 | Painting
Jehangir Sabavala (Artist), Coniferous Heights, 1963, Painting
Sabavala, Jehangir (Artist). Coniferous Heights, 1963 | Painting
Jehangir Sabavala (Artist), Jehangir Sabavala, 1964, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1964 | Solo Exhibition Catalogue | 00882930
Jehangir Sabavala (Artist), Jehangir Sabavala, 1964, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1964 | Solo Exhibition Invitation | 00859588
Jehangir Sabavala (Artist), The Air Is Full Of Soft Imaginings, 1964, Painting
Sabavala, Jehangir (Artist). The Air Is Full Of Soft Imaginings, 1964 | Painting
Cultural round-up, 1964, Newspaper Clipping
Cultural round-up, 31 January 1964 | Newspaper Clipping | 00728391
New picture of Jehangir Sabavala, 1964, Newspaper Clipping
New picture of Jehangir Sabavala, 20 January 1964 | Newspaper Clipping | 00728407
Art exhibition opened, 1964, Newspaper Clipping
Art exhibition opened, 30 January 1964 | Newspaper Clipping | 00728392
Sabavala's exhibition, 1964, Newspaper Clipping
Sabavala's exhibition, 25 January 1964 | Newspaper Clipping | 00728394
Transitional phase in Sabavala art, 1964, Newspaper Clipping
Transitional phase in Sabavala art, 31 January 1964 | Newspaper Clipping | 00728389
Bombay, 1964, Newspaper Clipping
Bombay, 25 January 1964 | Newspaper Clipping | 00728395
Sabavala's 9th one-man show, 1964, Newspaper Clipping
Sabavala's 9th one-man show, 26 January 1964 | Newspaper Clipping | 00728384
Characteristic quality in Sabavala's painting, 1964, Newspaper Clipping
Characteristic quality in Sabavala's painting, 26 January 1964 | Newspaper Clipping | 00728403
Romesh Malhotra (Writer), The Turbulence is gone, 1964, Newspaper Clipping
Malhotra, Romesh (Writer). The Turbulence is gone, 01 February 1964 | Newspaper Clipping | 00728393
Exhibition of the paintings of Jehangir Sabavala, 1964, Newspaper Clipping
Exhibition of the paintings of Jehangir Sabavala, 23 January 1964 | Newspaper Clipping | 00728402
Speaking of art, 1964, Newspaper Clipping
Speaking of art, 01 February 1964 | Newspaper Clipping | 00728396
Untitled, 1964, Newspaper Clipping
Untitled, 31 January 1964 | Newspaper Clipping | 00728386
Untitled, 1964, Newspaper Clipping
Untitled, 29 January 1964 | Newspaper Clipping | 00728405
Sabavala's paintings, 1964, Newspaper Clipping
Sabavala's paintings, 02 February 1964 | Newspaper Clipping | 00728398
Shakul Rawal (Editor), Jehangir Sabavala experimental new cubist tomorrow, 1964, Newspaper Clipping
Rawal, Shakul (Editor). Jehangir Sabavala experimental new cubist tomorrow, 03 February 1964 | Newspaper Clipping | 00728410
Governor to open paintings show, 1964, Newspaper Clipping
Governor to open paintings show, 29 January 1964 | Newspaper Clipping | 00728383
Sabavala ke chitra, 1964, Newspaper Clipping
Sabavala ke chitra, 05 February 1964 | Newspaper Clipping | 00728400
Sabavala's art exhibition, 1964, Newspaper Clipping
Sabavala's art exhibition, 08 February 1964 | Newspaper Clipping | 00728387
Mr. Sabawalani's art, 1964, Newspaper Clipping
Mr. Sabawalani's art, 01 February 1964 | Newspaper Clipping | 00728409
City diary, 1964, Newspaper Clipping
City diary, 29 January 1964 | Newspaper Clipping | 00728388
Engagements for today, 1964, Newspaper Clipping
Engagements for today, 29 January 1964 | Newspaper Clipping | 00728390
Jehangir Sabavala, 1964, Newspaper Clipping
Jehangir Sabavala, January 1964 | Newspaper Clipping | 00728425
The Next performance of Jehangir Sabavala, 1964, Newspaper Clipping
The Next performance of Jehangir Sabavala, 25 January 1964 | Newspaper Clipping | 00728406
Untitled, 1964, Newspaper Clipping
Untitled, 28 January 1964 | Newspaper Clipping | 00728397
Ninth one man exhibition of Jehangir Sabavala, 1964, Newspaper Clipping
Ninth one man exhibition of Jehangir Sabavala, 30 January 1964 | Newspaper Clipping | 00728404
Untitled, 1964, Newspaper Clipping
Untitled, 01 February 1964 | Newspaper Clipping | 00728385
200 of 1,172
Jehangir Sabavala (Writer), At the independent national show, 1950, Newspaper Clipping
Sabavala, Jehangir (Writer). At the independent national show, 01 July 1950 | Newspaper Clipping | 00728345
Reproduction albums in colors, 1950, Newspaper Clipping
Reproduction albums in colors, 01 May 1950 | Newspaper Clipping | 00728349
Jehangir Sabavala (Artist), Jehangir Sabavala, 1951, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1951 | Solo Exhibition Catalogue | 00882686
Jehangir Sabavala (Artist), Jehangir Sabavala, 1951, Solo Exhibition Invitation
Sabavala, Jehangir (Artist) and Karl J. Khandalawalla (Organiser). Jehangir Sabavala, 1951 | Solo Exhibition Invitation | 00859858
Jehangir Sabavala (Artist), Jehangir Sabavala, 1953, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1953 | Solo Exhibition Invitation | 00859584
Chitra (Essayist), Studies in Development of J. Sabavala, 1953, Essay
Chitra (Essayist). Studies in Development of J. Sabavala. In Marg. 6(2). April 1953 | Essay | 00668813
Untitled, 1953, Newspaper Clipping
Untitled, 1953 | Newspaper Clipping | 00728520
Untitled, 1954, Newspaper Clipping
Untitled, December 1954 | Newspaper Clipping | 00728355
Mulk Raj Anand (General Editor), Marg, 1956, Magazine
Anand, Mulk Raj (General Editor). Marg, December 1956 | Magazine | 00760198
Richard Lannoy (Essayist), Jehangir Sabavala, 1956, Essay
Lannoy, Richard (Essayist). Jehangir Sabavala. In Marg. 10(1). December 1956 | Essay | 00668844
Jehangir Sabavala (Writer), Why do I Paint?-IV, 1956, Newspaper Clipping
Sabavala, Jehangir (Writer). Why do I Paint?-IV, 25 March 1956 | Newspaper Clipping | 00728290
Jehangir Sabavala (Artist), Jehangir Sabavala, 1958, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1958 | Solo Exhibition Catalogue | 00882687
Jehangir Sabavala (Artist), Jehangir Sabavala, 1958, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1958 | Solo Exhibition Invitation | 00859585
Jehangir Ardeshir Sabavala (Writer), Untitled, 1958, Newspaper Clipping
Sabavala, Jehangir Ardeshir (Writer). Untitled, December 1958 | Newspaper Clipping | 00728363
The Art of Jehangir Sabavala, 1958, Newspaper Clipping
The Art of Jehangir Sabavala, 23 November 1958 | Newspaper Clipping | 00728272
Jehangir Sabavala, 1958, Newspaper Clipping
Jehangir Sabavala, November 1958 | Newspaper Clipping | 00728299
The Art of Jehangir Sabavala, 1959, Newspaper Clipping
The Art of Jehangir Sabavala, February 1959 | Newspaper Clipping | 00728342
Jehangir Sabavala, 1959, Newspaper Clipping
Jehangir Sabavala, 1959 | Newspaper Clipping | 00728319
A.S. Raman (Writer), Themes in modern indian art, 1960, Newspaper Clipping
Raman, A.S. (Writer). Themes in modern indian art, 17 April 1960 | Newspaper Clipping | 00728305
Jehangir Sabavala (Artist), Jehangir Sabavala, 1962, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1962 | Solo Exhibition Catalogue | 00882688
Jehangir Sabavala (Artist), Jehangir Sabavala, 1962, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1962 | Solo Exhibition Invitation | 00859586
Jehangir Sabavala (Artist), Jehangir Sabavala, 1963, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1963 | Solo Exhibition Invitation | 00859587
Jehangir Sabavala (Artist), Jehangir Sabavala, 1964, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1964 | Solo Exhibition Catalogue | 00882930
Jehangir Sabavala (Artist), Jehangir Sabavala, 1964, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1964 | Solo Exhibition Invitation | 00859588
Cultural round-up, 1964, Newspaper Clipping
Cultural round-up, 31 January 1964 | Newspaper Clipping | 00728391
New picture of Jehangir Sabavala, 1964, Newspaper Clipping
New picture of Jehangir Sabavala, 20 January 1964 | Newspaper Clipping | 00728407
Art exhibition opened, 1964, Newspaper Clipping
Art exhibition opened, 30 January 1964 | Newspaper Clipping | 00728392
Sabavala's exhibition, 1964, Newspaper Clipping
Sabavala's exhibition, 25 January 1964 | Newspaper Clipping | 00728394
Transitional phase in Sabavala art, 1964, Newspaper Clipping
Transitional phase in Sabavala art, 31 January 1964 | Newspaper Clipping | 00728389
Bombay, 1964, Newspaper Clipping
Bombay, 25 January 1964 | Newspaper Clipping | 00728395
Sabavala's 9th one-man show, 1964, Newspaper Clipping
Sabavala's 9th one-man show, 26 January 1964 | Newspaper Clipping | 00728384
Characteristic quality in Sabavala's painting, 1964, Newspaper Clipping
Characteristic quality in Sabavala's painting, 26 January 1964 | Newspaper Clipping | 00728403
Romesh Malhotra (Writer), The Turbulence is gone, 1964, Newspaper Clipping
Malhotra, Romesh (Writer). The Turbulence is gone, 01 February 1964 | Newspaper Clipping | 00728393
Exhibition of the paintings of Jehangir Sabavala, 1964, Newspaper Clipping
Exhibition of the paintings of Jehangir Sabavala, 23 January 1964 | Newspaper Clipping | 00728402
Speaking of art, 1964, Newspaper Clipping
Speaking of art, 01 February 1964 | Newspaper Clipping | 00728396
Untitled, 1964, Newspaper Clipping
Untitled, 31 January 1964 | Newspaper Clipping | 00728386
Untitled, 1964, Newspaper Clipping
Untitled, 29 January 1964 | Newspaper Clipping | 00728405
Sabavala's paintings, 1964, Newspaper Clipping
Sabavala's paintings, 02 February 1964 | Newspaper Clipping | 00728398
Shakul Rawal (Editor), Jehangir Sabavala experimental new cubist tomorrow, 1964, Newspaper Clipping
Rawal, Shakul (Editor). Jehangir Sabavala experimental new cubist tomorrow, 03 February 1964 | Newspaper Clipping | 00728410
Governor to open paintings show, 1964, Newspaper Clipping
Governor to open paintings show, 29 January 1964 | Newspaper Clipping | 00728383
Sabavala ke chitra, 1964, Newspaper Clipping
Sabavala ke chitra, 05 February 1964 | Newspaper Clipping | 00728400
Sabavala's art exhibition, 1964, Newspaper Clipping
Sabavala's art exhibition, 08 February 1964 | Newspaper Clipping | 00728387
Mr. Sabawalani's art, 1964, Newspaper Clipping
Mr. Sabawalani's art, 01 February 1964 | Newspaper Clipping | 00728409
City diary, 1964, Newspaper Clipping
City diary, 29 January 1964 | Newspaper Clipping | 00728388
Engagements for today, 1964, Newspaper Clipping
Engagements for today, 29 January 1964 | Newspaper Clipping | 00728390
Jehangir Sabavala, 1964, Newspaper Clipping
Jehangir Sabavala, January 1964 | Newspaper Clipping | 00728425
The Next performance of Jehangir Sabavala, 1964, Newspaper Clipping
The Next performance of Jehangir Sabavala, 25 January 1964 | Newspaper Clipping | 00728406
Untitled, 1964, Newspaper Clipping
Untitled, 28 January 1964 | Newspaper Clipping | 00728397
Ninth one man exhibition of Jehangir Sabavala, 1964, Newspaper Clipping
Ninth one man exhibition of Jehangir Sabavala, 30 January 1964 | Newspaper Clipping | 00728404
Untitled, 1964, Newspaper Clipping
Untitled, 01 February 1964 | Newspaper Clipping | 00728385
Jahangiri Ba Dalanid (Writer), The Exhibition was inaugurated at the Taj Rit Gallery, 1964, Newspaper Clipping
Dalanid, Jahangiri Ba (Writer). The Exhibition was inaugurated at the Taj Rit Gallery, 06 February 1964 | Newspaper Clipping | 00728401
Jehangir Sabavala (Writer), Jo Anand ka nagar kaha jata ta, 1964, Newspaper Clipping
Sabavala, Jehangir (Writer). Jo Anand ka nagar kaha jata ta, 02 February 1964 | Newspaper Clipping | 00728426
Jehangir Sabavala (Writer), Exhibition of cubic paintings, 1964, Newspaper Clipping
Sabavala, Jehangir (Writer). Exhibition of cubic paintings, 30 January 1964 | Newspaper Clipping | 00728399
Sabavala ke chitra, 1964, Newspaper Clipping
Sabavala ke chitra, 05 February 1964 | Newspaper Clipping | 00728408
Sabavala, 1964, Newspaper Clipping
Sabavala, February 1964 | Newspaper Clipping | 00728263
The Sculptor's Prospects, 1964, Newspaper Clipping
The Sculptor's Prospects, February 1964 | Newspaper Clipping | 00728262
Jehangir Sabavala (Artist), Jehangir Sabavala, 1966, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1966 | Solo Exhibition Catalogue | 00882689
Mulk Raj Anand (Editor), Sabavala, 1966, Edited Book
Anand, Mulk Raj (Editor). Sabavala, n.d. | Edited Book | 00845861
Untitled, 1966, Newspaper Clipping
Untitled, 18 November 1966 | Newspaper Clipping | 00728440
As it happens..., 1966, Newspaper Clipping
As it happens..., 12 December 1966 | Newspaper Clipping | 00728379
Untitled, 1966, Newspaper Clipping
Untitled, November 1966 | Newspaper Clipping | 00728431
Engagements for today, 1966, Newspaper Clipping
Engagements for today, 17 November 1966 | Newspaper Clipping | 00728428
Poetic painter, 1966, Newspaper Clipping
Poetic painter, 12 December 1966 | Newspaper Clipping | 00728438
Jehangir Sabavala, 1966, Newspaper Clipping
Jehangir Sabavala, 12 November 1966 | Newspaper Clipping | 00728419
Untitled, 1966, Newspaper Clipping
Untitled, 19 November 1966 | Newspaper Clipping | 00728429
Art galleries and museums, 1966, Newspaper Clipping
Art galleries and museums, 16 December 1966 | Newspaper Clipping | 00728435
Sabavala's art exhibition, 1966, Newspaper Clipping
Sabavala's art exhibition, 17 November 1966 | Newspaper Clipping | 00728432
Sabavala ke chitra, 1966, Newspaper Clipping
Sabavala ke chitra, 22 November 1966 | Newspaper Clipping | 00728455
Sabavala's art highlighted by vibrant landscapes, 1966, Newspaper Clipping
Sabavala's art highlighted by vibrant landscapes, December 1966 | Newspaper Clipping | 00728415
Heart gum painting of Jehangir Sabavala, 1966, Newspaper Clipping
Heart gum painting of Jehangir Sabavala, 21 November 1966 | Newspaper Clipping | 00728456
Untitled, 1966, Newspaper Clipping
Untitled, December 1966 | Newspaper Clipping | 00728442
Sabavala's tenth one-man show, 1966, Newspaper Clipping
Sabavala's tenth one-man show, 12 November 1966 | Newspaper Clipping | 00728434
Sabavala chintan-shol chitrakar, 1966, Newspaper Clipping
Sabavala chintan-shol chitrakar, 19 November 1966 | Newspaper Clipping | 00728453
Untitled, 1966, Newspaper Clipping
Untitled, 23 December 1966 | Newspaper Clipping | 00728436
Sabavala's creative activity comes to the fore, 1966, Newspaper Clipping
Sabavala's creative activity comes to the fore, 20 November 1966 | Newspaper Clipping | 00728439
Untitled, 1966, Newspaper Clipping
Untitled, 16 November 1966 | Newspaper Clipping | 00728420
Gieve Patel (Writer), Sabavala's new direction, 1966, Newspaper Clipping
Patel, Gieve (Writer). Sabavala's new direction, November 1966 | Newspaper Clipping | 00728447
The Next picture exhibition of Jehangir Sabavala, 1966, Newspaper Clipping
The Next picture exhibition of Jehangir Sabavala, 12 November 1966 | Newspaper Clipping | 00728443
Rang-roshniyon ke strot, 1966, Newspaper Clipping
Rang-roshniyon ke strot, 23 December 1966 | Newspaper Clipping | 00728421
Poetical touch, 1966, Newspaper Clipping
Poetical touch, 13 December 1966 | Newspaper Clipping | 00728376
Sabavala's new landscapes, 1966, Newspaper Clipping
Sabavala's new landscapes, 07 December 1966 | Newspaper Clipping | 00728437
Art of Jehangir Sabavala, 1966, Newspaper Clipping
Art of Jehangir Sabavala, 21 November 1966 | Newspaper Clipping | 00728454
Painter with direction sense, 1966, Newspaper Clipping
Painter with direction sense, 13 December 1966 | Newspaper Clipping | 00728381
Jehangir Sabavala (Writer), The Wandering shades, 1966, Newspaper Clipping
Sabavala, Jehangir (Writer). The Wandering shades, 23 December 1966 | Newspaper Clipping | 00728441
Two exhibitions in city, 1966, Newspaper Clipping
Two exhibitions in city, 19 November 1966 | Newspaper Clipping | 00728430
Impressive paintings, 1966, Newspaper Clipping
Impressive paintings, 13 December 1966 | Newspaper Clipping | 00728382
A World of mystery in Sabavala's art, 1966, Newspaper Clipping
A World of mystery in Sabavala's art, December 1966 | Newspaper Clipping | 00728422
Sabavala's exhibition..., 1966, Newspaper Clipping
Sabavala's exhibition..., November 1966 | Newspaper Clipping | 00728418
Sabavala's painting, 1966, Newspaper Clipping
Sabavala's painting, December 1966 | Newspaper Clipping | 00728448
Sabavala's show for New Delhi, 1966, Newspaper Clipping
Sabavala's show for New Delhi, 10 December 1966 | Newspaper Clipping | 00728378
Untitled, 1966, Newspaper Clipping
Untitled, 18 November 1966 | Newspaper Clipping | 00728417
Art, 1966, Newspaper Clipping
Art, November 1966 | Newspaper Clipping | 00728416
Sabavala exhibition, 1966, Newspaper Clipping
Sabavala exhibition, 05 November 1966 | Newspaper Clipping | 00728433
One man exhibition by painter Jehangir Sabavala, 1966, Newspaper Clipping
One man exhibition by painter Jehangir Sabavala, 13 November 1966 | Newspaper Clipping | 00728445
The Art world of Sabavala, 1966, Newspaper Clipping
The Art world of Sabavala, 13 December 1966 | Newspaper Clipping | 00728375
Sabavala's paintings, 1966, Newspaper Clipping
Sabavala's paintings, 13 December 1966 | Newspaper Clipping | 00728380
An Exhibition of Jehangir Sabavala's panties, 1966, Newspaper Clipping
An Exhibition of Jehangir Sabavala's panties, 12 November 1966 | Newspaper Clipping | 00728444
Rocco de Pietro (Writer), The Art of Sabavala, 1966, Newspaper Clipping
Pietro, Rocco de (Writer). The Art of Sabavala, 17 December 1966 | Newspaper Clipping | 00728264
J Roberta (Writer), Jehangir Sabavala, 1966, Newspaper Clipping
Roberta, J (Writer). Jehangir Sabavala, November 1966 | Newspaper Clipping | 00728341
Jehangir Sabavala pictures, 1966, Newspaper Clipping
Jehangir Sabavala pictures, 16 November 1966 | Newspaper Clipping | 00728313
Rocco de Pietro (Writer), The Art of Sabavala, 1966, Newspaper Clipping
Pietro, Rocco de (Writer). The Art of Sabavala, 17 December 1966 | Newspaper Clipping | 00728320
Exhibition of paintings by Sabavala, 1966, Newspaper Clipping
Exhibition of paintings by Sabavala, 14 November 1966 | Newspaper Clipping | 00728312
J Roberta (Writer), Jehangir Sabavala, 1966, Newspaper Clipping
Roberta, J (Writer). Jehangir Sabavala, November 1966 | Newspaper Clipping | 00728340
Chitrangada (Writer), The Growth of an artist, 1966, Newspaper Clipping
Chitrangada (Writer). The Growth of an artist, 25 December 1966 | Newspaper Clipping | 00728287
A Variety of paintings by Sabavala, 1966, Newspaper Clipping
A Variety of paintings by Sabavala, 19 November 1966 | Newspaper Clipping | 00728309
Exhibtion of Jehangir Sabavala, 1966, Newspaper Clipping
Exhibtion of Jehangir Sabavala, 07 November 1966 | Newspaper Clipping | 00728310
A Book of pictures by Sabavala, 1966, Newspaper Clipping
A Book of pictures by Sabavala, 14 November 1966 | Newspaper Clipping | 00728311
Arts and letters, 1966, Newspaper Clipping
Arts and letters, December 1966 | Newspaper Clipping | 00728286
Untitled, 1967, Newspaper Clipping
Untitled, 14 January 1967 | Newspaper Clipping | 00728377
Of persons places and things, 1967, Newspaper Clipping
Of persons places and things, January 1967 | Newspaper Clipping | 00728265
Golden flight, 1967, Newspaper Clipping
Golden flight, 1967 | Newspaper Clipping | 00728325
Jaya Appasamy (Editor), Lalit Kala Contemporary, 1968, Journal
Appasamy, Jaya (Editor) and S.A. Krishnan (Assistant Editor, design and layout). Lalit Kala Contemporary, September 1967-April 1968 | Journal | 00857958
Jehangir Sabavala (Writer), My work and attitudes to painting, 1968, Newspaper Clipping
Sabavala, Jehangir (Writer). My work and attitudes to painting, 1968 | Newspaper Clipping | 00728412
Untitled, 1968, Newspaper Clipping
Untitled, 1968 | Newspaper Clipping | 00728356
Jehangir Sabavala (Writer), What I think I am doing as an artist and why?, 1968, Newspaper Clipping
Sabavala, Jehangir (Writer). What I think I am doing as an artist and why?, 1968 | Newspaper Clipping | 00728301
Priti Debnath (Writer), Destination-Ranthambore Fort, 1968, Newspaper Clipping
Debnath, Priti (Writer). Destination-Ranthambore Fort, August 1968 | Newspaper Clipping | 00728300
Jehangir Sabavala (Artist), Jehangir Sabavala, 1969, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1969 | Solo Exhibition Catalogue | 00882931
Jehangir Sabavala (Artist), Jehangir Sabavala, 1969, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1969 | Solo Exhibition Catalogue | 00882690
Jehangir Sabavala (Artist), Jehangir Sabavala, 1969, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1969 | Solo Exhibition Invitation | 00859589
P.R. Ramachandra Rao (Author), Contemporary Indian Art, 1969, Authored Book
Rao, P.R. Ramachandra (Author). Contemporary Indian Art, 1969 | Authored Book | 00845457
Sabavala chitra pradarshan, 1969, Newspaper Clipping
Sabavala chitra pradarshan, 19 June 1969 | Newspaper Clipping | 00728459
Untitled, 1969, Newspaper Clipping
Untitled, 20 June 1969 | Newspaper Clipping | 00728471
Prafulla Mohanti (Writer), Paintings of Jehangir Sabavala, 1969, Newspaper Clipping
Mohanti, Prafulla (Writer). Paintings of Jehangir Sabavala, 18 September 1969 | Newspaper Clipping | 00728495
Sabavala explores unfettered horizons, 1969, Newspaper Clipping
Sabavala explores unfettered horizons, 15 June 1969 | Newspaper Clipping | 00728463
Sabavala exhibition, 1969, Newspaper Clipping
Sabavala exhibition, 14 June 1969 | Newspaper Clipping | 00728464
Jehangir Sabavala, 1969, Newspaper Clipping
Jehangir Sabavala, 21 June 1969 | Newspaper Clipping | 00728472
Noel Lobo (Writer), The Queen of hearts, 1969, Newspaper Clipping
Lobo, Noel (Writer). The Queen of hearts, 24 June 1969 | Newspaper Clipping | 00728466
Exhibition of Jehangir Sabavala's painting, 1969, Newspaper Clipping
Exhibition of Jehangir Sabavala's painting, 12 June 1969 | Newspaper Clipping | 00728458
Jehangir Sanavala, 1969, Newspaper Clipping
Jehangir Sanavala, 18 June 1969 | Newspaper Clipping | 00728462
Jehangir Sabavala paints personalised landscape, 1969, Newspaper Clipping
Jehangir Sabavala paints personalised landscape, September 1969 | Newspaper Clipping | 00728490
Upcoming painting exhibition by Jehangir Sabavala , 1969, Newspaper Clipping
Upcoming painting exhibition by Jehangir Sabavala , 13 June 1969 | Newspaper Clipping | 00728461
Jehangir Sabavala takes a new look at indian scene, 1969, Newspaper Clipping
Jehangir Sabavala takes a new look at indian scene, 12 September 1969 | Newspaper Clipping | 00728478
Exhibition of Jehangir Sabavala's painting, 1969, Newspaper Clipping
Exhibition of Jehangir Sabavala's painting, 14 June 1969 | Newspaper Clipping | 00728460
The Paintings of Jehangir Sabavala, 1969, Newspaper Clipping
The Paintings of Jehangir Sabavala, 13 September 1969 | Newspaper Clipping | 00728494
India and Africa...., 1969, Newspaper Clipping
India and Africa...., 15 September 1969 | Newspaper Clipping | 00728492
J.D. Singh (Writer), Sabavala's show proves popular, 1969, Newspaper Clipping
Singh, J.D. (Writer). Sabavala's show proves popular, 05 October 1969 | Newspaper Clipping | 00728479
John FitzMaurice Mill (Writer), Art forum, 1969, Newspaper Clipping
Mill, John FitzMaurice (Writer). Art forum, 12 September 1969 | Newspaper Clipping | 00728493
In the city today, 1969, Newspaper Clipping
In the city today, 19 June 1969 | Newspaper Clipping | 00728470
Dayanesh (Writer), Sabavala's paintings, 1969, Newspaper Clipping
Dayanesh (Writer). Sabavala's paintings, 23 June 1969 | Newspaper Clipping | 00728469
Jehangir Sabavala's refreshing show, 1969, Newspaper Clipping
Jehangir Sabavala's refreshing show, 14 September 1969 | Newspaper Clipping | 00728489
Soft shades, 1969, Newspaper Clipping
Soft shades, 12 July 1969 | Newspaper Clipping | 00728474
Attention to tonalities in Sabavala's paintings, 1969, Newspaper Clipping
Attention to tonalities in Sabavala's paintings, 21 June 1969 | Newspaper Clipping | 00728473
Vincent Kofi (Writer), Jehangir Sabavala, 1969, Newspaper Clipping
Kofi, Vincent (Writer). Jehangir Sabavala, 13 September 1969 | Newspaper Clipping | 00728491
The Bombayman's diary, 1969, Newspaper Clipping
The Bombayman's diary, 22 June 1969 | Newspaper Clipping | 00728467
Sabavala's landscapes are lyrical, 1969, Newspaper Clipping
Sabavala's landscapes are lyrical, 22 June 1969 | Newspaper Clipping | 00728468
S.D. Aphale (Writer), The Modern art exhibitions , 1969, Newspaper Clipping
Aphale, S.D. (Writer). The Modern art exhibitions , 22 June 1969 | Newspaper Clipping | 00728465
Exhibition of Sabavala's artwork in London and Scotland, 1969, Newspaper Clipping
Exhibition of Sabavala's artwork in London and Scotland, 11 June 1969 | Newspaper Clipping | 00728457
Urmila Manaktala (Writer), Art and paper products, 1969, Newspaper Clipping
Manaktala, Urmila (Writer). Art and paper products, June 1969 | Newspaper Clipping | 00728427
Jehangir Sabavala (Writer), A Modern painter looks at advertising, 1969, Newspaper Clipping
Sabavala, Jehangir (Writer). A Modern painter looks at advertising, June 1969 | Newspaper Clipping | 00728327
Untitled, 1969, Newspaper Clipping
Untitled, 22 June 1969 | Newspaper Clipping | 00728335
Gallery guide, 1969, Newspaper Clipping
Gallery guide, 30 August 1969 | Newspaper Clipping | 00728347
Exhibitions, 1969, Newspaper Clipping
Exhibitions, 06 September 1969 | Newspaper Clipping | 00728333
Untitled, 1969, Newspaper Clipping
Untitled, 22 August 1969 | Newspaper Clipping | 00728348
Welcome to Edinburgh, 1969, Newspaper Clipping
Welcome to Edinburgh, October 1969 | Newspaper Clipping | 00728336
Jehangir Sabavala, 1969, Newspaper Clipping
Jehangir Sabavala, 30 August 1969 | Newspaper Clipping | 00728332
Exhibitions, 1969, Newspaper Clipping
Exhibitions, 10 October 1969 | Newspaper Clipping | 00728337
From Sabavala's easel, 1969, Newspaper Clipping
From Sabavala's easel, June 1969 | Newspaper Clipping | 00728271
Museums and art collections, 1969, Newspaper Clipping
Museums and art collections, 20 September 1969 | Newspaper Clipping | 00728331
Untitled, 1969, Newspaper Clipping
Untitled, 15 June 1969 | Newspaper Clipping | 00728334
Realistic painting style of Jehangir Sabavala, 1969, Newspaper Clipping
Realistic painting style of Jehangir Sabavala, 22 June 1969 | Newspaper Clipping | 00728291
Jehangir Sabavala (Writer), Believing landscapes, 1969, Newspaper Clipping
Sabavala, Jehangir (Writer). Believing landscapes, 28 June 1969 | Newspaper Clipping | 00728292
The Art of Sabavala, 1969, Newspaper Clipping
The Art of Sabavala, 21 June 1969 | Newspaper Clipping | 00728293
Smi La Chahbanou visited an indian painting exhibition, 1970, Newspaper Clipping
Smi La Chahbanou visited an indian painting exhibition, 17 May 1970 | Newspaper Clipping | 00728487
Indian art exhibition in Tehran, 1970, Newspaper Clipping
Indian art exhibition in Tehran, June 1970 | Newspaper Clipping | 00728488
Imaginative workmanship, 1971, Newspaper Clipping
Imaginative workmanship, 04 May 1971 | Newspaper Clipping | 00728475
Untitled, 1971, Newspaper Clipping
Untitled, 09 May 1971 | Newspaper Clipping | 00728476
Excellent group show at pundole gallery, 1971, Newspaper Clipping
Excellent group show at pundole gallery, 05 May 1971 | Newspaper Clipping | 00728477
Everest documentary is to be screened , 1971, Newspaper Clipping
Everest documentary is to be screened , 04 May 1971 | Newspaper Clipping | 00728496
Jehangir Sabavala (Writer), Contemporary artists of repute, 1971, Newspaper Clipping
Sabavala, Jehangir (Writer). Contemporary artists of repute, 01 September 1971 | Newspaper Clipping | 00728297
Jehangir Sabavala (Artist), Jehangir Sabavala, 1972, Solo Exhibition Catalogue
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1972 | Solo Exhibition Catalogue | 00882691
Untitled, 1972, Newspaper Clipping
Untitled, 14 December 1972 | Newspaper Clipping | 00728482
Anil Saari (Writer), Sabavala, 1972, Newspaper Clipping
Saari, Anil (Writer). Sabavala, 21 December 1972 | Newspaper Clipping | 00728508
Yatri aur yatrayen, 1972, Newspaper Clipping
Yatri aur yatrayen, 24 December 1972 | Newspaper Clipping | 00728499
Jehangir Sabavala , 1972, Newspaper Clipping
Jehangir Sabavala , 14 December 1972 | Newspaper Clipping | 00728480
K.K. Nair (Writer), Untitled, 1972, Newspaper Clipping
Nair, K.K. (Writer). Untitled, 22 December 1972 | Newspaper Clipping | 00728502
Amita Malik (Writer), Delhi notebook, 1972, Newspaper Clipping
Malik, Amita (Writer). Delhi notebook, 31 December 1972 | Newspaper Clipping | 00728505
Sabavala to show recent paintings, 1972, Newspaper Clipping
Sabavala to show recent paintings, 12 December 1972 | Newspaper Clipping | 00728484
Sabavala casts a spell, 1972, Newspaper Clipping
Sabavala casts a spell, 17 December 1972 | Newspaper Clipping | 00728503
Senstivity is Sabavala's forte, 1972, Newspaper Clipping
Senstivity is Sabavala's forte, 13 December 1972 | Newspaper Clipping | 00728501
In the city today, 1972, Newspaper Clipping
In the city today, 13 December 1972 | Newspaper Clipping | 00728498
S. Sakthi Kumar (Writer), Jehangir Sabavala is intellectual painter, 1972, Newspaper Clipping
Kumar, S. Sakthi (Writer). Jehangir Sabavala is intellectual painter, 15 December 1972 | Newspaper Clipping | 00728507
Untitled, 1972, Newspaper Clipping
Untitled, December 1972 | Newspaper Clipping | 00728481
Untitled, 1972, Newspaper Clipping
Untitled, 22 December 1972 | Newspaper Clipping | 00728483
Exhibition of Sabavala's painting in Delhi, 1972, Newspaper Clipping
Exhibition of Sabavala's painting in Delhi, December 1972 | Newspaper Clipping | 00728485
Mira Savara (Writer), His canvas speaks, 1972, Newspaper Clipping
Savara, Mira (Writer). His canvas speaks, 09 December 1972 | Newspaper Clipping | 00728514
Sabavala's paintings reflect integrity, 1972, Newspaper Clipping
Sabavala's paintings reflect integrity, 13 December 1972 | Newspaper Clipping | 00728506
Shanta Serbjeet Singh (Writer), Sabavala's innerscapes, 1972, Newspaper Clipping
Singh, Shanta Serbjeet (Writer). Sabavala's innerscapes, 31 December 1972 | Newspaper Clipping | 00728504
Exhibition of Sabavala's painting in Delhi, 1972, Newspaper Clipping
Exhibition of Sabavala's painting in Delhi, 14 December 1972 | Newspaper Clipping | 00728497
Gauri Deshpande (Writer), Muted austerities, 1972, Newspaper Clipping
Deshpande, Gauri (Writer). Muted austerities, December 1972 | Newspaper Clipping | 00728423
Good paintings are a beauty today and a fortune tomorrow, 1972, Newspaper Clipping
Good paintings are a beauty today and a fortune tomorrow, November 1972 | Newspaper Clipping | 00728338
Gautam S. G. Vohra (Writer), Why is modern indian art not so indian?, 1972, Newspaper Clipping
Vohra, Gautam S. G. (Writer). Why is modern indian art not so indian?, 28 July 1972 | Newspaper Clipping | 00728298
Jehangir Sabavala, 1972, Newspaper Clipping
Jehangir Sabavala, 21 May 1972 | Newspaper Clipping | 00728350
Symposium, what we expect from our art organisations, 1972, Newspaper Clipping
Symposium, what we expect from our art organisations, January 1972 | Newspaper Clipping | 00728296
Cubist influence on modern indian paintings, 1972, Newspaper Clipping
Cubist influence on modern indian paintings, July 1972 | Newspaper Clipping | 00728294
Abstract art, 1972, Newspaper Clipping
Abstract art, April 1972 | Newspaper Clipping | 00728323
Jehangir Sabavala (Artist), Jehangir Sabavala, 1973, Solo Exhibition Invitation
Sabavala, Jehangir (Artist). Jehangir Sabavala, 1973 | Solo Exhibition Invitation | 00859859
Untitled, 1973, Newspaper Clipping
Untitled, January 1973 | Newspaper Clipping | 00728518
Sabavala's art show, 1973, Newspaper Clipping
Sabavala's art show, 15 February 1973 | Newspaper Clipping | 00728515
Untitled, 1973, Newspaper Clipping
Untitled, 11 February 1973 | Newspaper Clipping | 00728517
Kushal Dayal (Writer), The Greetings man, 1973, Newspaper Clipping
Dayal, Kushal (Writer). The Greetings man, March 1973 | Newspaper Clipping | 00728500
200 of 806
Unknown (Photographer), Bapsy Sabavala with elder son Sharokh and Jehangir, Paris, France, 1932, Contemporary Photograph
Unknown (Photographer). Bapsy Sabavala with elder son Sharokh and Jehangir, Paris, France, 1932 | Contemporary Photograph
Unknown (Photographer), Jehangir Sabavala as a child, 1932, Contemporary Photograph
Unknown (Photographer). Jehangir Sabavala as a child, 1932 | Contemporary Photograph
Unknown (Photographer), A Japanese dinner aboard the SS Asama Maru, America bound. A Purser with Bapsy, her friend Piroja and Jehangir, 1939, Contemporary Photograph
Unknown (Photographer). A Japanese dinner aboard the SS Asama Maru, America bound. A Purser with Bapsy, her friend Piroja and Jehangir, 1939 | Contemporary Photograph
Unknown (Photographer), Sabavala as 'Ishaak' in 'The Golden Journey to Samarkand', staged by the Elphinstone College Dramatics Society at the Cowasjee Jehangir Hall, Bombay, India, 1941, Contemporary Photograph
Unknown (Photographer). Sabavala as 'Ishaak' in 'The Golden Journey to Samarkand', staged by the Elphinstone College Dramatics Society at the Cowasjee Jehangir Hall, Bombay, India, Early 1940s | Contemporary Photograph
Jehangir Sabavala (Artist), Untitled, 1942, Painting
Sabavala, Jehangir (Artist). Untitled, 1942 | Painting
Jehangir Sabavala (Artist), Untitled, 1942, Drawing
Sabavala, Jehangir (Artist). Untitled, 1942 | Drawing
Jehangir Sabavala (Artist), The Festival, 1942, Painting
Sabavala, Jehangir (Artist). The Festival, c.1942 | Painting
Jehangir Sabavala (Artist), Untitled, 1942, Drawing
Sabavala, Jehangir (Artist). Untitled, 1942 | Drawing
Jehangir Sabavala (Artist), Untitled, 1942, Drawing
Sabavala, Jehangir (Artist). Untitled, 1942 | Drawing
Jehangir Sabavala (Artist), Roman Head, 1942, Painting
Sabavala, Jehangir (Artist). Roman Head, 1942 | Painting
Jehangir Sabavala (Artist), Untitled, 1942, Graphic Art
Sabavala, Jehangir (Artist). Untitled, 1942 | Graphic Art
Jehangir Sabavala (Artist), Plaster Cast, 1942, Drawing
Sabavala, Jehangir (Artist). Plaster Cast, 1942 | Drawing
Jehangir Sabavala (Artist), Before The Temple, 1943, Painting
Sabavala, Jehangir (Artist). Before The Temple, 1943 | Painting
Jehangir Sabavala (Artist), Untitled, 1943, Painting
Sabavala, Jehangir (Artist). Untitled, 1943 | Painting
Jehangir Sabavala (Artist), Nude Study, 1944, Drawing
Sabavala, Jehangir (Artist). Nude Study, 1944 | Drawing
Jehangir Sabavala (Artist), Maki, 1945, Painting
Sabavala, Jehangir (Artist). Maki, 1945 | Painting
Jehangir Sabavala (Artist), The Festival, 1945, Painting
Sabavala, Jehangir (Artist). The Festival, c. late 1940s | Painting
Jehangir Sabavala (Artist), Untitled, 1946, Drawing
Sabavala, Jehangir (Artist). Untitled, 1946 | Drawing
Jehangir Sabavala (Artist), Nude Studies, 1946, Painting
Sabavala, Jehangir (Artist). Nude Studies, 1946 | Painting
Jehangir Sabavala (Artist), Seated Nude, 1946, Drawing
Sabavala, Jehangir (Artist). Seated Nude, 1946 | Drawing
Jehangir Sabavala (Artist), Untitled, 1947, Drawing
Sabavala, Jehangir (Artist). Untitled, 1947 | Drawing
Jehangir Sabavala (Artist), Untitled (Nude), 1947, Drawing
Sabavala, Jehangir (Artist). Untitled (Nude), 1947 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Nude Study (Paris), 1948, Drawing
Sabavala, Jehangir (Artist). Nude Study (Paris), 1948 | Drawing
Jehangir Sabavala (Artist), Nude Study (Paris), 1948, Drawing
Sabavala, Jehangir (Artist). Nude Study (Paris), 1948 | Drawing
Jehangir Sabavala (Artist), Seated Nude - I, 1948, Painting
Sabavala, Jehangir (Artist). Seated Nude - I, 1948 | Painting
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing & Sketch
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing & Sketch
Jehangir Sabavala (Artist), Untitled, 1948, Painting
Sabavala, Jehangir (Artist). Untitled, 1948 | Painting
Jehangir Sabavala (Artist), Nanette, 1948, Drawing
Sabavala, Jehangir (Artist). Nanette, 1948 | Drawing
Jehangir Sabavala (Artist), Nanette, 1948, Drawing
Sabavala, Jehangir (Artist). Nanette, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Painting
Sabavala, Jehangir (Artist). Untitled, 1948 | Painting
Jehangir Sabavala (Artist), Hobo, 1948, Drawing
Sabavala, Jehangir (Artist). Hobo, 1948 | Drawing
Jehangir Sabavala (Artist), Untitled, 1948, Drawing
Sabavala, Jehangir (Artist). Untitled, 1948 | Drawing
Jehangir Sabavala (Artist), Standing Male Nude, 1948, Painting
Sabavala, Jehangir (Artist). Standing Male Nude, 1948 | Painting
Jehangir Sabavala (Artist), Standing Male Nude, 1948, Painting
Sabavala, Jehangir (Artist). Standing Male Nude, 1948 | Painting
Jehangir Sabavala (Artist), Nude Study, 1948, Painting
Sabavala, Jehangir (Artist). Nude Study, 1948 | Painting
Jehangir Sabavala (Artist), Still Life, 1948, Painting
Sabavala, Jehangir (Artist). Still Life, 1948 | Painting
Jehangir Sabavala (Artist), Nude Study, 1948, Drawing
Sabavala, Jehangir (Artist). Nude Study, 1948 | Drawing
Jehangir Sabavala (Artist), Self portrait, 1948, Painting
Sabavala, Jehangir (Artist). Self portrait, 1948 | Painting
Jehangir Sabavala (Artist), Untitled, 1949, Drawing
Sabavala, Jehangir (Artist). Untitled, 1949 | Drawing
Jehangir Sabavala (Artist), Nude, 1949, Painting
Sabavala, Jehangir (Artist). Nude, 1949 | Painting
Jehangir Sabavala (Artist), Reclining Nude, 1949, Drawing
Sabavala, Jehangir (Artist). Reclining Nude, 1949 | Drawing
Jehangir Sabavala (Artist), Untitled (Sculptor's Model), 1949, Painting
Sabavala, Jehangir (Artist). Untitled (Sculptor's Model), late 1940s | Painting
Jehangir Sabavala (Artist), Untitled, 1949, Painting
Sabavala, Jehangir (Artist). Untitled, 1949 | Painting
Jehangir Sabavala (Artist), Reclining Nude, 1949, Painting
Sabavala, Jehangir (Artist). Reclining Nude, 1949 | Painting
Jehangir Sabavala (Artist), Still Life with Apples, 1949, Painting
Sabavala, Jehangir (Artist). Still Life with Apples, 1949 | Painting
Jehangir Sabavala (Artist), Still Life with Apples, 1949, Painting
Sabavala, Jehangir (Artist). Still Life with Apples, 1949 | Painting
Jehangir Sabavala (Artist), Nude, 1949, Painting
Sabavala, Jehangir (Artist). Nude, 1949 | Painting
Jehangir Sabavala (Artist), Montenegran Gypsy, 1949, Painting
Sabavala, Jehangir (Artist). Montenegran Gypsy, 1949 | Painting
Jehangir Sabavala (Artist), Nue au Chale (Nude with Shawl), 1949, Painting
Sabavala, Jehangir (Artist). Nue au Chale (Nude with Shawl), 1949 | Painting
Jehangir Sabavala (Artist), Reclining Nude, 1949, Painting
Sabavala, Jehangir (Artist). Reclining Nude, 1949 | Painting
Jehangir Sabavala (Artist), Nude, 1949, Painting
Sabavala, Jehangir (Artist). Nude, 1949 | Painting
Jehangir Sabavala (Artist), Montenegran Gypsy, 1949, Painting
Sabavala, Jehangir (Artist). Montenegran Gypsy, 1949 | Painting
Jehangir Sabavala (Artist), Reclining Nude, 1949, Painting
Sabavala, Jehangir (Artist). Reclining Nude, 1949 | Painting
Jehangir Sabavala (Artist), Seated Nude IV, 1949, Painting
Sabavala, Jehangir (Artist). Seated Nude IV, 1949 | Painting
Unknown (Photographer), Jehangir (fifth from right) in a group photograph, Academie Julian, 1949, Contemporary Photograph
Unknown (Photographer). Jehangir (fifth from right) in a group photograph, Academie Julian, 1949 | Contemporary Photograph
Jehangir Sabavala (Artist), Untitled, 1950, Drawing
Sabavala, Jehangir (Artist). Untitled, 1950 | Drawing
Jehangir Sabavala (Artist), Untitled, 1950, Drawing
Sabavala, Jehangir (Artist). Untitled, 1950 | Drawing
Jehangir Sabavala (Artist), Le Chapelle Hank De Cagnes, 1950, Painting
Sabavala, Jehangir (Artist). Le Chapelle Hank De Cagnes, 1950 | Painting
Jehangir Sabavala (Artist), Still Life in Brown, 1950, Painting
Sabavala, Jehangir (Artist). Still Life in Brown, 1950 | Painting
Jehangir Sabavala (Artist), Nude Study, Woman Reclining, 1950, Painting
Sabavala, Jehangir (Artist). Nude Study, Woman Reclining, 1950 | Painting
Jehangir Sabavala (Artist), Flower Study, 1950, Painting
Sabavala, Jehangir (Artist). Flower Study, 1950 | Painting
Jehangir Sabavala (Artist), Untitled, 1950, Drawing
Sabavala, Jehangir (Artist). Untitled, 1950 | Drawing
Jehangir Sabavala (Artist), Garcon Assis, 1950, Painting
Sabavala, Jehangir (Artist). Garcon Assis, 1950 | Painting
Jehangir Sabavala (Artist), Nude Studies, 1950, Drawing
Sabavala, Jehangir (Artist). Nude Studies, 1950 | Drawing
Jehangir Sabavala (Artist), Leaves A Violin, 1950, Painting
Sabavala, Jehangir (Artist). Leaves A Violin, 1950 | Painting
Jehangir Sabavala (Artist), Garcon Assis, 1950, Painting
Sabavala, Jehangir (Artist). Garcon Assis, 1950 | Painting
Jehangir Sabavala (Artist), Still Life with Fruit, 1950, Painting
Sabavala, Jehangir (Artist). Still Life with Fruit, 1949-1950 | Painting
Jehangir Sabavala (Artist), Still Life, 1950, Painting
Sabavala, Jehangir (Artist). Still Life, 1950 | Painting
Unknown (Photographer),  Andre Lhote's Studio, 1950, Contemporary Photograph
Unknown (Photographer). Andre Lhote's Studio, 1950 | Contemporary Photograph
Jehangir Sabavala (Artist), Portrait of Meher (The Grey Sari), 1951, Painting
Sabavala, Jehangir (Artist). Portrait of Meher (The Grey Sari), 1951 | Painting
Jehangir Sabavala (Artist), The White Veni, 1951, Painting
Sabavala, Jehangir (Artist). The White Veni, 1951 | Painting
Jehangir Sabavala (Artist), The Grey Sari, 1951, Painting
Sabavala, Jehangir (Artist). The Grey Sari, 1951 | Painting
Jehangir Sabavala (Artist), Untitled (Still Life), 1952, Painting
Sabavala, Jehangir (Artist). Untitled (Still Life), 1952 | Painting
Jehangir Sabavala (Artist), Untitled (Boats in Harbor), 1952, Painting
Sabavala, Jehangir (Artist). Untitled (Boats in Harbor), 1952 | Painting
Jehangir Sabavala (Artist), Self portrait, 1952, Painting
Sabavala, Jehangir (Artist). Self portrait, 1952 | Painting
Jehangir Sabavala (Artist), Portofino, 1953, Painting
Sabavala, Jehangir (Artist). Portofino, 1953 | Painting
Jehangir Sabavala (Artist), Portrait of Shirin, 1953, Painting
Sabavala, Jehangir (Artist). Portrait of Shirin, 1953 | Painting
Jehangir Sabavala (Artist), Capri Hillside, 1954, Painting
Sabavala, Jehangir (Artist). Capri Hillside, 1954 | Painting
Jehangir Sabavala (Artist), The Faraglioni, 1954, Painting
Sabavala, Jehangir (Artist). The Faraglioni, 1954 | Painting
Jehangir Sabavala (Artist), The Four Milk-Maids, 1954, Painting
Sabavala, Jehangir (Artist). The Four Milk-Maids, 1954 | Painting
Jehangir Sabavala (Artist), The Bangle Sellers, 1954, Painting
Sabavala, Jehangir (Artist). The Bangle Sellers, 1954 | Painting
Jehangir Sabavala (Artist), The Faraglioni, Capri, 1954, Painting
Sabavala, Jehangir (Artist). The Faraglioni, Capri, 1954 | Painting
Jehangir Sabavala (Artist), Positano, 1954, Painting
Sabavala, Jehangir (Artist). Positano, 1954 | Painting
Jehangir Sabavala (Artist), Benkei II, 1955, Painting
Sabavala, Jehangir (Artist). Benkei II, 1955 | Painting
Jehangir Sabavala (Artist), The Madonna, 1955, Painting
Sabavala, Jehangir (Artist). The Madonna, 1955 | Painting
Jehangir Sabavala (Artist), Untitled (Portrait Of A Lady), 1955, Painting
Sabavala, Jehangir (Artist). Untitled (Portrait Of A Lady), c.1950s | Painting
Jehangir Sabavala (Artist), An Egyptian Reverie, 1955, Painting
Sabavala, Jehangir (Artist). An Egyptian Reverie, 1955 | Painting
Jehangir Sabavala (Artist), Untitled (Matheran), 1955, Painting
Sabavala, Jehangir (Artist). Untitled (Matheran), c.early 1950s | Painting
Jehangir Sabavala (Artist), Fisher-Folk Madh Island, 1955, Painting
Sabavala, Jehangir (Artist). Fisher-Folk Madh Island, 1955 | Painting
Jehangir Sabavala (Artist), Benkei, the Warrior Priest II, 1955, Painting
Sabavala, Jehangir (Artist). Benkei, the Warrior Priest II, 1955 | Painting
Jehangir Sabavala (Artist), Benkei, the Warrior Priest I, 1955, Painting
Sabavala, Jehangir (Artist). Benkei, the Warrior Priest I, 1955 | Painting
Jehangir Sabavala (Artist), Objects Composed, 1955, Painting
Sabavala, Jehangir (Artist). Objects Composed, 1955 | Painting
Jehangir Sabavala (Artist), Sous-Marin (Underwater), 1956, Painting
Sabavala, Jehangir (Artist). Sous-Marin (Underwater), 1956 | Painting
Jehangir Sabavala (Artist), The Waterpump, Jaipur, 1956, Painting
Sabavala, Jehangir (Artist). The Waterpump, Jaipur, 1956 | Painting
Jehangir Sabavala (Artist), White Bougainvillaea, 1956, Painting
Sabavala, Jehangir (Artist). White Bougainvillaea, 1956 | Painting
Jehangir Sabavala (Artist), Young Man, 1956, Drawing
Sabavala, Jehangir (Artist). Young Man, 1956 | Drawing
Jehangir Sabavala (Artist), The Time of Day, 1956, Painting
Sabavala, Jehangir (Artist). The Time of Day, 1956 | Painting
Jehangir Sabavala (Artist), The Pavement Dwellers, 1956, Painting
Sabavala, Jehangir (Artist). The Pavement Dwellers, 1956 | Painting
Jehangir Sabavala (Artist), A Village Gathering, Rajasthan, 1956, Painting
Sabavala, Jehangir (Artist). A Village Gathering, Rajasthan, 1956 | Painting
Jehangir Sabavala (Artist), Canna-heads and Swan, 1957, Painting
Sabavala, Jehangir (Artist). Canna-heads and Swan, 1957 | Painting
Jehangir Sabavala (Artist), Earthenware and Fruit, 1958, Painting
Sabavala, Jehangir (Artist). Earthenware and Fruit, 1958 | Painting
Jehangir Sabavala (Artist), Winged Flight, 1958, Painting
Sabavala, Jehangir (Artist). Winged Flight, 1958 | Painting
Jehangir Sabavala (Artist), Crucifixion I, 1958, Painting
Sabavala, Jehangir (Artist). Crucifixion I, 1958 | Painting
Jehangir Sabavala (Artist), The Madonna of the Holy Ghost, 1958, Painting
Sabavala, Jehangir (Artist). The Madonna of the Holy Ghost, 1958 | Painting
Jehangir Sabavala (Artist), Jugs In Consonance, 1959, Painting
Sabavala, Jehangir (Artist). Jugs In Consonance, 1959 | Painting
Jehangir Sabavala (Artist), Butterflies Over Pink Blossoms, 1959, Painting
Sabavala, Jehangir (Artist). Butterflies Over Pink Blossoms, 1959 | Painting
Jehangir Sabavala (Artist), Sundown, 1959, Painting
Sabavala, Jehangir (Artist). Sundown, 1959 | Painting
Jehangir Sabavala (Artist), Earthenware, 1959, Painting
Sabavala, Jehangir (Artist). Earthenware, 1959 | Painting
Jehangir Sabavala (Artist), The Descent from the Cross, 1959, Painting
Sabavala, Jehangir (Artist). The Descent from the Cross, 1959 | Painting
Jehangir Sabavala (Artist), Jugs in Consonance, 1959, Painting
Sabavala, Jehangir (Artist). Jugs in Consonance, 1959 | Painting
Jehangir Sabavala (Artist), Pieta, 1959, Painting
Sabavala, Jehangir (Artist). Pieta, 1959 | Painting
Jehangir Sabavala (Artist), Under Sail, 1959, Painting
Sabavala, Jehangir (Artist). Under Sail, 1959 | Painting
Jehangir Sabavala (Artist), On The Brink Of The Forest, 1960, Painting
Sabavala, Jehangir (Artist). On The Brink Of The Forest, 1960 | Painting
Jehangir Sabavala (Artist), Of Ships and Stars, 1960, Painting
Sabavala, Jehangir (Artist). Of Ships and Stars, 1960 | Painting
Jehangir Sabavala (Artist), Incarnadine, 1960, Painting
Sabavala, Jehangir (Artist). Incarnadine, 1960 | Painting
Jehangir Sabavala (Artist), Untitled, 1960, Painting
Sabavala, Jehangir (Artist). Untitled, 1960 | Painting
Jehangir Sabavala (Artist), Cobra Lilies, 1960, Painting
Sabavala, Jehangir (Artist). Cobra Lilies, 1960 | Painting
Jehangir Sabavala (Artist), Treescape - Mahabaleshwar, 1960, Painting
Sabavala, Jehangir (Artist). Treescape - Mahabaleshwar, 1960 | Painting
Jehangir Sabavala (Artist), Sunflowers, 1960, Painting
Sabavala, Jehangir (Artist). Sunflowers, 1960 | Painting
Jehangir Sabavala (Artist), Incarnadine, 1960, Painting
Sabavala, Jehangir (Artist). Incarnadine, 1960 | Painting
Jehangir Sabavala (Artist), Treescape, 1960, Painting
Sabavala, Jehangir (Artist). Treescape, 1960 | Painting
Jehangir Sabavala (Artist), Musicians, 1960, Painting
Sabavala, Jehangir (Artist). Musicians, 1960 | Painting
Jehangir Sabavala (Artist), Sanchi, 1960, Painting
Sabavala, Jehangir (Artist). Sanchi, 1960 | Painting
Jehangir Sabavala (Artist), Empoli Glass, 1961, Painting
Sabavala, Jehangir (Artist). Empoli Glass, 1961 | Painting
Jehangir Sabavala (Artist), Still Life with Bottles, 1961, Painting
Sabavala, Jehangir (Artist). Still Life with Bottles, 1961 | Painting
Jehangir Sabavala (Artist), Still life with Bottles, 1961, Painting
Sabavala, Jehangir (Artist). Still life with Bottles, 1961 | Painting
Jehangir Sabavala (Artist), Still-Life with Bottles, 1961, Painting
Sabavala, Jehangir (Artist). Still-Life with Bottles, 1961 | Painting
Jehangir Sabavala (Artist), And Wilt Thou Leave Me Thus, 1961, Painting
Sabavala, Jehangir (Artist). And Wilt Thou Leave Me Thus, 1961 | Painting
Jehangir Sabavala (Artist), Marine Encounter, 1962, Painting
Sabavala, Jehangir (Artist). Marine Encounter, 1962 | Painting
Jehangir Sabavala (Artist), Missile, 1962, Painting
Sabavala, Jehangir (Artist). Missile, 1962 | Painting
Jehangir Sabavala (Artist), Down to a Sunless Sea, 1962, Painting
Sabavala, Jehangir (Artist). Down to a Sunless Sea, 1962 | Painting
Jehangir Sabavala (Artist), Down to a Sunless Sea, 1962, Painting
Sabavala, Jehangir (Artist). Down to a Sunless Sea, 1962 | Painting
Jehangir Sabavala (Artist), Beached Boats, 1962, Painting
Sabavala, Jehangir (Artist). Beached Boats, 1962 | Painting
Jehangir Sabavala (Artist), Evenfall, 1962, Painting
Sabavala, Jehangir (Artist). Evenfall, 1962 | Painting
Jehangir Sabavala (Artist), Untitled, 1962, Painting
Sabavala, Jehangir (Artist). Untitled, 1962 | Painting
Jehangir Sabavala (Artist), Heat Haze, 1962, Painting
Sabavala, Jehangir (Artist). Heat Haze, 1962 | Painting
Jehangir Sabavala (Artist), The Journey of the Magi, 1963, Painting
Sabavala, Jehangir (Artist). The Journey of the Magi, 1963 | Painting
Jehangir Sabavala (Artist), The Thundercloud, 1963, Painting
Sabavala, Jehangir (Artist). The Thundercloud, 1963 | Painting
Jehangir Sabavala (Artist), The Radiant Spheres, 1963, Painting
Sabavala, Jehangir (Artist). The Radiant Spheres, 1963 | Painting
Jehangir Sabavala (Artist), The Intangible Menace, 1963, Painting
Sabavala, Jehangir (Artist). The Intangible Menace, 1963 | Painting
Jehangir Sabavala (Artist), In the World's Afterlight, 1963, Painting
Sabavala, Jehangir (Artist). In the World's Afterlight, 1963 | Painting
Jehangir Sabavala (Artist), The Journey of Magi, 1963, Painting
Sabavala, Jehangir (Artist). The Journey of Magi, 1963 | Painting
Jehangir Sabavala (Artist), Golden Flight, 1963, Painting
Sabavala, Jehangir (Artist). Golden Flight, 1963 | Painting
Jehangir Sabavala (Artist), White Forms on an Azure Light, 1963, Painting
Sabavala, Jehangir (Artist). White Forms on an Azure Light, 1963 | Painting
Jehangir Sabavala (Artist), Coniferous Heights, 1963, Painting
Sabavala, Jehangir (Artist). Coniferous Heights, 1963 | Painting
Jehangir Sabavala (Artist), The Air Is Full Of Soft Imaginings, 1964, Painting
Sabavala, Jehangir (Artist). The Air Is Full Of Soft Imaginings, 1964 | Painting
Jehangir Sabavala (Artist), Icarus Series, 1964, Painting
Sabavala, Jehangir (Artist). Icarus Series, 1964 | Painting
Jehangir Sabavala (Artist), The Nuns I, 1964, Painting
Sabavala, Jehangir (Artist). The Nuns I, 1964 | Painting
Jehangir Sabavala (Artist), The Close of Day, 1964, Painting
Sabavala, Jehangir (Artist). The Close of Day, 1964 | Painting
Jehangir Sabavala (Artist), The Tree, 1965, Painting
Sabavala, Jehangir (Artist). The Tree, 1965 | Painting
Jehangir Sabavala (Artist), Evening's Pale Light, 1965, Painting
Sabavala, Jehangir (Artist). Evening's Pale Light, 1965 | Painting
Jehangir Sabavala (Artist), Nocturne, 1965, Painting
Sabavala, Jehangir (Artist). Nocturne, 1965 | Painting
Jehangir Sabavala (Artist), Plum - Dark Twilight, 1965, Painting
Sabavala, Jehangir (Artist). Plum - Dark Twilight, 1965 | Painting
Jehangir Sabavala (Artist), Icarus, 1965, Painting
Sabavala, Jehangir (Artist). Icarus, 1965 | Painting
Jehangir Sabavala (Artist), Plum - Dark Twilight, 1965, Painting
Sabavala, Jehangir (Artist). Plum - Dark Twilight, 1965 | Painting
Jehangir Sabavala (Artist), Plum - Dark Twilight, 1965, Painting
Sabavala, Jehangir (Artist). Plum - Dark Twilight, 1965 | Painting
Jehangir Sabavala (Artist), The Embarkation, 1965, Painting
Sabavala, Jehangir (Artist). The Embarkation, 1965 | Painting
Jehangir Sabavala (Artist), Plum Darkness, 1965, Painting
Sabavala, Jehangir (Artist). Plum Darkness, 1965 | Painting
Jehangir Sabavala (Artist), Nocturne, 1965, Painting
Sabavala, Jehangir (Artist). Nocturne, 1965 | Painting
Jehangir Sabavala (Artist), Plum - Dark Twilight, 1965, Painting
Sabavala, Jehangir (Artist). Plum - Dark Twilight, 1965 | Painting
Jehangir Sabavala (Artist), Icarus, 1965, Painting
Sabavala, Jehangir (Artist). Icarus, 1965 | Painting
Jehangir Sabavala (Artist), In The Ambush Of A Calm, 1966, Painting
Sabavala, Jehangir (Artist). In The Ambush Of A Calm, 1966 | Painting
Jehangir Sabavala (Artist), The Break Through, 1966, Painting
Sabavala, Jehangir (Artist). The Break Through, 1966 | Painting
Jehangir Sabavala (Artist), In The Ambush Of A Calm, 1966, Painting
Sabavala, Jehangir (Artist). In The Ambush Of A Calm, 1966 | Painting
Jehangir Sabavala (Artist), Mirage, 1966, Painting
Sabavala, Jehangir (Artist). Mirage, 1966 | Painting
Jehangir Sabavala (Artist), In the Ambush of a Calm, 1966, Painting
Sabavala, Jehangir (Artist). In the Ambush of a Calm, 1966 | Painting
Jehangir Sabavala (Artist), Black Lillies, 1966, Painting
Sabavala, Jehangir (Artist). Black Lillies, 1966 | Painting
Jehangir Sabavala (Artist), Untitled (Waterlilies), 1966, Painting
Sabavala, Jehangir (Artist). Untitled (Waterlilies), 1966 | Painting
Jehangir Sabavala (Artist), Black Lilies, 1966, Painting
Sabavala, Jehangir (Artist). Black Lilies, 1966 | Painting
Jehangir Sabavala (Artist), Mirage, 1966, Painting
Sabavala, Jehangir (Artist). Mirage, 1966 | Painting
Jehangir Sabavala (Artist), In the Ambush of a Calm, 1966, Painting
Sabavala, Jehangir (Artist). In the Ambush of a Calm, 1966 | Painting
Jehangir Sabavala (Artist), A Rose Is A Rose Is A Rose, 1966, Painting
Sabavala, Jehangir (Artist). A Rose Is A Rose Is A Rose, 1966 | Painting
Jehangir Sabavala (Artist), Khedut, 1967, Painting
Sabavala, Jehangir (Artist). Khedut, 1967 | Painting
Jehangir Sabavala (Artist), Stag Antlered Trees, 1967, Painting
Sabavala, Jehangir (Artist). Stag Antlered Trees, 1967 | Painting
Jehangir Sabavala (Artist), The Sand-Bank, 1967, Painting
Sabavala, Jehangir (Artist). The Sand-Bank, 1967 | Painting
Jehangir Sabavala (Artist), Untitled, 1967, Painting
Sabavala, Jehangir (Artist). Untitled, 1967 | Painting
Jehangir Sabavala (Artist), Stag-Antlered Trees, 1967, Painting
Sabavala, Jehangir (Artist). Stag-Antlered Trees, 1967 | Painting
Jehangir Sabavala (Artist), Sentinwl Trees, 1967, Painting
Sabavala, Jehangir (Artist). Sentinwl Trees, 1967 | Painting
Jehangir Sabavala (Artist), Sentinel Trees I, 1967, Painting
Sabavala, Jehangir (Artist). Sentinel Trees I, 1967 | Painting
Jehangir Sabavala (Artist), Green Isthmus, 1967, Painting
Sabavala, Jehangir (Artist). Green Isthmus, 1967 | Painting
Jehangir Sabavala (Artist), Vespers I, 1968, Painting
Sabavala, Jehangir (Artist). Vespers I, 1968 | Painting
Jehangir Sabavala (Artist), The Estuary II, 1968, Painting
Sabavala, Jehangir (Artist). The Estuary II, 1968 | Painting
Jehangir Sabavala (Artist), And the Paddy was not Yet Long, 1968, Painting
Sabavala, Jehangir (Artist). And the Paddy was not Yet Long, 1968 | Painting
Jehangir Sabavala (Artist), The Twilight Kingdom, 1968, Painting
Sabavala, Jehangir (Artist). The Twilight Kingdom, 1968 | Painting
Jehangir Sabavala (Artist), The Sky like a Furnace Burning, 1968, Painting
Sabavala, Jehangir (Artist). The Sky like a Furnace Burning, 1968 | Painting
Jehangir Sabavala (Artist), The Star that Beckons, 1968, Painting
Sabavala, Jehangir (Artist). The Star that Beckons, 1968 | Painting
Jehangir Sabavala (Artist), The Star that Beckons, 1968, Painting
Sabavala, Jehangir (Artist). The Star that Beckons, 1968 | Painting
Jehangir Sabavala (Artist), Vespers I, 1968, Painting
Sabavala, Jehangir (Artist). Vespers I, 1968 | Painting
Jehangir Sabavala (Artist), The Unruffled Calm, 1970, Painting
Sabavala, Jehangir (Artist). The Unruffled Calm, 1970 | Painting
Jehangir Sabavala (Artist), Green Thoughts in a Green Shade, 1970, Painting
Sabavala, Jehangir (Artist). Green Thoughts in a Green Shade, 1970 | Painting
Jehangir Sabavala (Artist), The Hooded Day, 1970, Painting
Sabavala, Jehangir (Artist). The Hooded Day, 1970 | Painting
Jehangir Sabavala (Artist), The Hooded Day, 1970, Painting
Sabavala, Jehangir (Artist). The Hooded Day, 1970 | Painting
Jehangir Sabavala (Artist), The Return to the Ancestral Land, 1970, Painting
Sabavala, Jehangir (Artist). The Return to the Ancestral Land, 1970 | Painting
Jehangir Sabavala (Artist), The Flight Into Egypt - I, 1971, Painting
Sabavala, Jehangir (Artist). The Flight Into Egypt - I, 1971 | Painting
Jehangir Sabavala (Artist), The Long Dark Land, 1971, Painting
Sabavala, Jehangir (Artist). The Long Dark Land, 1971 | Painting
Jehangir Sabavala (Artist), The Long Dark Land, 1971, Painting
Sabavala, Jehangir (Artist). The Long Dark Land, 1971 | Painting
200 of 366
Jehangir Sabavala (Artist), In the Ambush of a Calm, 1966, Painting
Sabavala, Jehangir (Artist). In the Ambush of a Calm, 1966 | Painting
Mulk Raj Anand (Editor), Sabavala, 1966, Edited Book
Anand, Mulk Raj (Editor). Sabavala, n.d. | Edited Book | 00845861
Ratan Parimoo (Author), Studies in Modern Indian Art, 1975, Authored Book
Parimoo, Ratan (Author). Studies in Modern Indian Art, 1975 | Authored Book | 00845450
Jehangir Sabavala (Author), The Reasoning Vision, 1980, Authored Book
Sabavala, Jehangir (Author). The Reasoning Vision, 1980 | Authored Book | 00845362
R.L. Bartholomew (Editor), Jehangir Sabavala, 1984, Edited Book
Bartholomew, R.L. (Editor). Jehangir Sabavala, 1984 | Edited Book | 00845984
Bina Sarkar Ellias (Editor), Fifty Years of Indian Art, 1997, Edited Book
Ellias, Bina Sarkar (Editor). Fifty Years of Indian Art, 1997 | Edited Book | 00846173
Anupa Mehta (Editor), The Jehangir Nicholson Collection, 1998, Edited Book
Mehta, Anupa (Editor). The Jehangir Nicholson Collection, 1998 | Edited Book | 00846188
Yashodhara Dalmia (Author), The Making of Modern Indian Art, 2001, Authored Book
Dalmia, Yashodhara (Author). The Making of Modern Indian Art, 2001 | Authored Book | 00845422
Rahul Mehrotra (Author), The Jehangir Art Gallery, 2002, Authored Book
Mehrotra, Rahul (Author). The Jehangir Art Gallery, 2002 | Authored Book | 00844450
Ranjit Hoskote (Author), The Crucible of Painting, 2005, Authored Book
Hoskote, Ranjit (Author). The Crucible of Painting, 2005 | Authored Book | 00845713
Yashodhara Dalmia (Author), Memory, Metaphor, Mutations, 2007, Authored Book
Dalmia, Yashodhara (Author). Memory, Metaphor, Mutations, 2007 | Authored Book | 00845423
Yashodhara Dalmia (Author), Journeys, 2011, Authored Book
Dalmia, Yashodhara (Author). Journeys, 2011 | Authored Book | 00845424
Rati Bartholomew (Editor), Richard Bartholomew, 2012, Edited Book
Bartholomew, Rati (Editor). Richard Bartholomew, 2012 | Edited Book | 00846403
DAG (Organiser), A Visual History of Indian Modern Art, 2015, Group Exhibition Catalogue
DAG (Organiser) and Kishore Singh (Curator). A Visual History of Indian Modern Art, 2015 | Group Exhibition Catalogue | 00883457
Shruti Parthasarathy (Editor), KB Goel, 2020, Edited Book
Parthasarathy, Shruti (Editor). KB Goel, 2020 | Edited Book | 00846485

Related

46

Personalities

32

A. Ramachandran
A. RamachandranComparable Artworks
Akbar Padamsee
Akbar PadamseeComparable Artworks
Amrita Sher-Gil
Amrita Sher-GilComparable Artworks
Bhupen P. Khakhar
Bhupen P. KhakharComparable Artworks
Bikash Bhattacharjee
Bikash BhattacharjeeComparable Artworks
Ebrahim Alkazi
Ebrahim AlkaziComparable Artworks
F.N. Souza
F.N. SouzaComparable Artworks
Gaganendranath Tagore
Gaganendranath TagoreComparable Artworks
Ganesh Pyne
Ganesh PyneComparable Artworks
Gieve Patel
Gieve PatelComparable Artworks
HEART
HEARTComparable Artworks
J. Sultan Ali
J. Sultan AliComparable Artworks
J. Swaminathan
J. SwaminathanComparable Artworks
Jamini Roy
Jamini RoyComparable Artworks
Jogen Chowdhury
Jogen ChowdhuryComparable Artworks
K.G. Subramanyan
K.G. SubramanyanComparable Artworks
K.K. Hebbar
K.K. HebbarComparable Artworks
Krishen Khanna
Krishen KhannaComparable Artworks
M.F. Husain
M.F. HusainComparable Artworks
Manjit Bawa
Manjit BawaComparable Artworks
N.S. Bendre
N.S. BendreComparable Artworks
Nicholas Roerich
Nicholas RoerichComparable Artworks
Osian's
Osian'sComparable Artworks
P.V. Janakiram
P.V. JanakiramComparable Artworks
Prabhakar Barwe
Prabhakar BarweComparable Artworks
Raja Ravi Varma
Raja Ravi VarmaComparable Artworks
Rameshwar Broota
Rameshwar BrootaComparable Artworks
Ramkumar
RamkumarComparable Artworks
Sayed Haider Raza
Sayed Haider RazaComparable Artworks
Subodh Gupta
Subodh GuptaComparable Artworks
Tyeb Mehta
Tyeb MehtaComparable Artworks
V.S. Gaitonde
V.S. GaitondeComparable Artworks

Institutions

9

Art Bull
Art BullComparable Artworks
Artiana
ArtianaComparable Artworks
Asta Guru
Asta GuruComparable Artworks
Bid & Hammer
Bid & HammerComparable Artworks
Bonhams
BonhamsComparable Artworks
Bowrings
BowringsComparable Artworks
Christie's
Christie'sComparable Artworks
DAG
DAGComparable Artworks
Mapin Publishing
Mapin PublishingComparable Artworks

Themes

5

Art Heritage Annual
Art Heritage AnnualComparable Artworks
Artrends
ArtrendsComparable Artworks
Blitz - India's National News Magazine
Blitz - India's National News MagazineComparable Artworks
Lalit Kala Contemporary Journal
Lalit Kala Contemporary JournalComparable Artworks
Marg
MargComparable Artworks
                          Sabavala, Jehangir (Artist). Untitled. Pencil on paper, 1948 | Drawing | FineArts | 00646963

                          Estimates

                          ₹400,000 - 600,000

                          $6,670 - 10,000

                          Winning Bid

                          ₹504,000

                          $8,139

                          Artwork Square Inch Rate (S.I.R)

                          2826.30

                          Lot Ratio | Hammer Price / Lower Estimate

                          1.26

                          Jehangir Sabavala | 23 Aug 1922 – 02 Sep 2011

                          ArtistJehangir Sabavala
                          TitleUntitled
                          MediumPencil on paper
                          Date1948
                          Size15.51 x 11.50 in (39.40 x 29.20 cm)
                          Lot Number91
                          Auction HouseSaffronart
                          Venue / LocationMumbai
                          Date of Auction02 December 2014
                          Type of AuctionOffline

                          Research Categories

                          2_FineArts6_EconomicsArt14_IndoWorld
                          Source
                          saffronart-modern-masters-on-paper-02-december-2014-mumbai-auction-catalogue

                          Related Links6

                          Masterlist2
                          SaffronartJehangir Sabavala
                          Research Categories3
                          02Modern and Contemporary Indian Fine Arts06Economics of Art & Cultural Industry14India and her Relationship with the World
                          Object
                          Saffronart Modern Masters on Paper 02 December 2014 Mumbai Auction Catalogue